Home / North America / Canada / Steel plants / ArcelorMittal Montreal steel plant

ArcelorMittal Montreal steel plant

Steel Plant in Canada. Approximate location 45.83697, -73.25145.

Steel PlantCanadaCO₂ reported

ArcelorMittal Montreal steel plant is a steel plant in Canada with a reported capacity of 2,400,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by ArcelorMittal Long Products Canada GP. By capacity it ranks #4 of 8 steel plants tracked in Canada. It emits about 933,302 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 217,553 cars. Its CO₂ per unit of capacity is about 28% below the median steel plant.

2,400,000t of steel
933,302t CO₂e / yr (Climate TRACE)
#22CO₂ rank in Canada
0.39t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566468.

En contexte: comment cette installation se compare

À 2,400,000 t of steel, ArcelorMittal Montreal steel plant est autour de la médiane des steel plant en Canada (2,400,000 t of steel). Son CO₂ par unité de capacité est approximativement 49% en dessous de la médiane des steel plant. Sous-secteur: iron-and-steel. Comme steel plant, elle nécessite une chaleur de procédé intensive (typiquement 800–1500°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les aciéries brûlent du charbon dans des hauts fourneaux ou utilisent des arcs électriques pour fondre des ferrailles; dans les deux cas, le métal en fusion doit être maintenu au-dessus de 1.500°C et transféré à travers des tuyauteries et récipients chauds étendus.

Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.

What 933,302 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

217,553cars driven for a year
121,714homes' annual energy use
15,555,033tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Canada

ArcelorMittal Dofasco steel plant: 4,050,000 t of steel4.0MArcelorMit…Algoma steel plant: 3,200,000 t of steel3.2MAlgoma ste…Cleveland-Cliffs Lake Erie steel plant: 2,500,000 t of steel2.5MCleveland-…ArcelorMittal Montreal steel plant: 2,400,000 t of steel2.4MArcelorMit…Evraz Regina Steel plant: 1,200,000 t of steel1.2MEvraz Regi…Gerdau Whitby Steel Mill: 1,100,000 t of steel1.1MGerdau Whi…Ivaco Rolling Mills steel plant: 650,000 t of steel650kIvaco Roll…Rio Tinto Fer et Titane steel plant: 600,000 t of steel600kRio Tinto …

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by ArcelorMittal Long Products Canada GP. All facilities by this operator →

Local climate

ArcelorMittal Montreal steel plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 45.8°N in the northern hemisphere.

~6°Ctypical annual mean
~19°Ctypical warm-season
Warm-summer humid continental: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #4 largest of 8 steel plants in Canada by reported capacity.

Nearby industrial sites

Location

Coordinates 45.83697, -73.25145. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is ArcelorMittal Montreal steel plant?

ArcelorMittal Montreal steel plant is a steel plant in Canada. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of ArcelorMittal Montreal steel plant?

ArcelorMittal Montreal steel plant has a reported capacity of 2,400,000 t of steel.

How much CO₂ does ArcelorMittal Montreal steel plant emit?

ArcelorMittal Montreal steel plant emits about 933,302 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 217,553 cars. That ranks #22 among tracked facilities in Canada.

Where is ArcelorMittal Montreal steel plant located?

ArcelorMittal Montreal steel plant is in Canada, near coordinates 45.83697, -73.25145.

Who operates ArcelorMittal Montreal steel plant?

ArcelorMittal Montreal steel plant is operated by ArcelorMittal Long Products Canada GP.

Built from open public data; no personal information. Operate this site? Request a correction or removal.