Cement Plant in Bolivia. Approximate location -18.95069, -58.27783.
Cement PlantBoliviaCO₂ reported
Yacuses Cement Plant is a cement plant in Bolivia with a reported capacity of 950,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Itacamba Cemento SA. By capacity it ranks #5 of 7 cement plants tracked in Bolivia. It emits about 157,876 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 36,801 cars. Its CO₂ per unit of capacity is about 54% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437269.
Con 950,000 t of cement, Yacuses Cement Plant está alrededor de la mediana de cement plant en Bolivia (1,100,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 52% por debajo de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Itacamba Cemento SA. All facilities by this operator →
Yacuses Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 19.0°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #5 largest of 7 cement plants in Bolivia by reported capacity.
Coordinates -18.95069, -58.27783. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Yacuses Cement Plant is a cement plant in Bolivia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Yacuses Cement Plant has a reported capacity of 950,000 t of cement.
Yacuses Cement Plant emits about 157,876 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 36,801 cars. That ranks #6 among tracked facilities in Bolivia.
Yacuses Cement Plant is in Bolivia, near coordinates -18.95069, -58.27783.
Yacuses Cement Plant is operated by Itacamba Cemento SA.