Home / South America / Brazil / Cement plants / Vitoria Cement Plant

Vitoria Cement Plant

Cement Plant in Brazil. Approximate location -20.26179, -40.23393.

Cement PlantBrazilCO₂ reported

Vitoria Cement Plant is a cement plant in Brazil with a reported capacity of 720,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Mizu Cimentos SA. By capacity it ranks #44 of 57 cement plants tracked in Brazil. It emits about 215,700 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 50,280 cars. Its CO₂ per unit of capacity is about 17% below the median cement plant.

720,000t of cement
215,700t CO₂e / yr (Climate TRACE)
#104CO₂ rank in Brazil
0.30t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895303.

En contexto: cómo se compara esta instalación

Con 720,000 t of cement, Vitoria Cement Plant está por debajo de la mediana de cement plant en Brazil (1,461,000 t of cement). Su CO₂ por unidad de capacidad es aproximadamente 8% por debajo de la mediana de cement plant. Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 215,700 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

50,280cars driven for a year
28,130homes' annual energy use
3,595,000tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Brazil

Rio Branco do Sul Cement Plant: 7,000,000 t of cement7.0MRio Branco…Lagoa Santa Cement Plant: 4,900,000 t of cement4.9MLagoa Sant…Salto de Pirapora Cement Plant: 4,800,000 t of cement4.8MSalto de P…Ciplam Sobradinho Cement Plant: 3,800,000 t of cement3.8MCiplam Sob…Carandaí Cement Plant: 3,400,000 t of cement3.4MCarandaí C…Barroso Cement Plant: 3,200,000 t of cement3.2MBarroso Ce…Apiai Cement Plant: 3,200,000 t of cement3.2MApiai Ceme…Balsa nova Cement Plant: 2,800,000 t of cement2.8MBalsa nova…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Mizu Cimentos SA. All facilities by this operator →

Local climate

Vitoria Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 20.3°S in the southern hemisphere.

~26°Ctypical annual mean
~29°Ctypical warm-season
Tropical savanna: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #44 largest of 57 cement plants in Brazil by reported capacity.

Nearby industrial sites

Location

Coordinates -20.26179, -40.23393. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Vitoria Cement Plant?

Vitoria Cement Plant is a cement plant in Brazil. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Vitoria Cement Plant?

Vitoria Cement Plant has a reported capacity of 720,000 t of cement.

How much CO₂ does Vitoria Cement Plant emit?

Vitoria Cement Plant emits about 215,700 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 50,280 cars. That ranks #104 among tracked facilities in Brazil.

Where is Vitoria Cement Plant located?

Vitoria Cement Plant is in Brazil, near coordinates -20.26179, -40.23393.

Who operates Vitoria Cement Plant?

Vitoria Cement Plant is operated by Mizu Cimentos SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.