Cement Plant in Argentina. Approximate location -24.49084, -64.95717.
Cement PlantArgentinaCO₂ reported
El Carmen Cement Plant is a cement plant in Argentina with a reported capacity of 1,310,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim (Argentina) SA. By capacity it ranks #6 of 10 cement plants tracked in Argentina. It emits about 459,502 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 107,110 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895124.
Con 1,310,000 t of cement, El Carmen Cement Plant está alrededor de la mediana de cement plant en Argentina (1,600,000 t of cement). Subsector: cement. Como cement plant, requiere calor de proceso intenso (típicamente 800–1400°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de cemento calientan piedra caliza a 1.400°C en hornos rotativos — uno de los procesos industriales más calientes — y deben controlar la temperatura con precisión en toda la longitud del horno.
Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Holcim (Argentina) SA. All facilities by this operator →
El Carmen Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 24.5°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #6 largest of 10 cement plants in Argentina by reported capacity.
Coordinates -24.49084, -64.95717. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

El Carmen Cement Plant is a cement plant in Argentina. It burns limestone in high-temperature rotary kilns to make clinker and cement.
El Carmen Cement Plant has a reported capacity of 1,310,000 t of cement.
El Carmen Cement Plant emits about 459,502 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 107,110 cars. That ranks #16 among tracked facilities in Argentina.
El Carmen Cement Plant is in Argentina, near coordinates -24.49084, -64.95717.
El Carmen Cement Plant is operated by Holcim (Argentina) SA.