Home / Asia / Saudi Arabia / Steel plants / Al Ittefaq National Steel Dammam plant

Al Ittefaq National Steel Dammam plant

Steel Plant in Saudi Arabia. Approximate location 26.24395, 49.96594.

Steel PlantSaudi ArabiaCO₂ reported

Al Ittefaq National Steel Dammam plant is a steel plant in Saudi Arabia with a reported capacity of 1,000,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by National Steel Co. By capacity it ranks #4 of 6 steel plants tracked in Saudi Arabia. It emits about 423,032 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 98,609 cars. Its CO₂ per unit of capacity is about 22% below the median steel plant.

1,000,000t of steel
423,032t CO₂e / yr (Climate TRACE)
#46CO₂ rank in Saudi Arabia
0.42t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567043.

En contexto: cómo se compara esta instalación

Con 1,000,000 t of steel, Al Ittefaq National Steel Dammam plant está alrededor de la mediana de steel plant en Saudi Arabia (1,200,000 t of steel). Su CO₂ por unidad de capacidad es aproximadamente 22% por debajo de la mediana de steel plant. Subsector: iron-and-steel. Como steel plant, requiere calor de proceso intenso (típicamente 800–1500°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de acero queman carbón en altos hornos o utilizan arcos eléctricos para fundir chatarra; en ambos casos el metal fundido debe mantenerse por encima de 1.500°C y transferirse a través de tuberías y recipientes calientes extensos.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 423,032 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

98,609cars driven for a year
55,168homes' annual energy use
7,050,533tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Saudi Arabia

SABIC Hadeed Al Jubail steel plant: 6,000,000 t of steel6.0MSABIC Hade…Al Ittefaq Arab Steel Dammam plant: 2,600,000 t of steel2.6MAl Ittefaq…Solb Steel Jizan plant: 1,200,000 t of steel1.2MSolb Steel…Al Ittefaq National Steel Dammam plant: 1,000,000 t of steel1000kAl Ittefaq…Rajhi Al Assemah Steel Jeddah plant: 850,000 t of steel850kRajhi Al A…Al Qaryan steel plant: 700,000 t of steel700kAl Qaryan …

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by National Steel Co. All facilities by this operator →

Local climate

Al Ittefaq National Steel Dammam plant sits in a hot desert climate zone (Köppen BWh), at 26.2°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #4 largest of 6 steel plants in Saudi Arabia by reported capacity.

Nearby industrial sites

Location

Coordinates 26.24395, 49.96594. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Al Ittefaq National Steel Dammam plant?

Al Ittefaq National Steel Dammam plant is a steel plant in Saudi Arabia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Al Ittefaq National Steel Dammam plant?

Al Ittefaq National Steel Dammam plant has a reported capacity of 1,000,000 t of steel.

How much CO₂ does Al Ittefaq National Steel Dammam plant emit?

Al Ittefaq National Steel Dammam plant emits about 423,032 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 98,609 cars. That ranks #46 among tracked facilities in Saudi Arabia.

Where is Al Ittefaq National Steel Dammam plant located?

Al Ittefaq National Steel Dammam plant is in Saudi Arabia, near coordinates 26.24395, 49.96594.

Who operates Al Ittefaq National Steel Dammam plant?

Al Ittefaq National Steel Dammam plant is operated by National Steel Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.