Cement Plant in Pakistan. Approximate location 25.15323, 67.67212.
Cement PlantPakistanCO₂ reported
Dadabhoy Cement Kalu Kohar Cement Plant is a cement plant in Pakistan with a reported capacity of 1,022,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Dadabhoy Cement Industries Ltd. By capacity it ranks #26 of 31 cement plants tracked in Pakistan. It emits about 315,279 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 73,492 cars. Its CO₂ per unit of capacity is about 14% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897627.
Bei 1,022,000 t of cement ist Dadabhoy Cement Kalu Kohar Cement Plant unter dem Medianwert von cement plant in Pakistan (2,300,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 33% unter dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Dadabhoy Cement Industries Ltd. All facilities by this operator →
Dadabhoy Cement Kalu Kohar Cement Plant sits in a hot desert climate zone (Köppen BWh), at 25.2°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #26 largest of 31 cement plants in Pakistan by reported capacity.
Coordinates 25.15323, 67.67212. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Dadabhoy Cement Kalu Kohar Cement Plant is a cement plant in Pakistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Dadabhoy Cement Kalu Kohar Cement Plant has a reported capacity of 1,022,000 t of cement.
Dadabhoy Cement Kalu Kohar Cement Plant emits about 315,279 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 73,492 cars. That ranks #37 among tracked facilities in Pakistan.
Dadabhoy Cement Kalu Kohar Cement Plant is in Pakistan, near coordinates 25.15323, 67.67212.
Dadabhoy Cement Kalu Kohar Cement Plant is operated by Dadabhoy Cement Industries Ltd.