Home / Asia / Pakistan / Steel plants / Agha Steel Industries Karachi plant

Agha Steel Industries Karachi plant

Steel Plant in Pakistan. Approximate location 24.84185, 67.31135.

Steel PlantPakistanCO₂ reported

Agha Steel Industries Karachi plant is a steel plant in Pakistan with a reported capacity of 450,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Agha Steel Industries Ltd. By capacity it ranks #5 of 5 steel plants tracked in Pakistan. It emits about 59,702 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,917 cars. Its CO₂ per unit of capacity is about 75% below the median steel plant.

450,000t of steel
59,702t CO₂e / yr (Climate TRACE)
#45CO₂ rank in Pakistan
0.13t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567000.

Im Kontext: wie sich diese Anlage vergleicht

Bei 450,000 t of steel ist Agha Steel Industries Karachi plant unter dem Medianwert von steel plant in Pakistan (800,000 t of steel). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 87% unter dem Medianwert von steel plant. Untersektor: iron-and-steel. Als steel plant benötigt es intensive Prozesswärme (typischerweise 800–1500°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Stahlwerke verbrennen Kohle in Hochöfen oder nutzen Lichtbogenöfen zum Schmelzen von Schrott; in beiden Fällen muss das geschmolzene Metall über 1.500°C gehalten und durch umfangreiche heiße Rohrleitungen und Behälter geleitet werden.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 59,702 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

13,917cars driven for a year
7,786homes' annual energy use
995,033tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Pakistan

Amreli Steels Dhabeji plant: 1,200,000 t of steel1.2MAmreli Ste…Mughal Iron & Steel Industries Lahore plant: 1,166,000 t of steel1.2MMughal Iro…Ittehad Steel Faisalabad plant: 800,000 t of steel800kIttehad St…Faizan Steel Karachi steel plant: 730,000 t of steel730kFaizan Ste…Agha Steel Industries Karachi plant: 450,000 t of steel450kAgha Steel…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Agha Steel Industries Ltd. All facilities by this operator →

Local climate

Agha Steel Industries Karachi plant sits in a hot desert climate zone (Köppen BWh), at 24.8°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #5 largest of 5 steel plants in Pakistan by reported capacity.

Nearby industrial sites

Location

Coordinates 24.84185, 67.31135. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Agha Steel Industries Karachi plant?

Agha Steel Industries Karachi plant is a steel plant in Pakistan. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Agha Steel Industries Karachi plant?

Agha Steel Industries Karachi plant has a reported capacity of 450,000 t of steel.

How much CO₂ does Agha Steel Industries Karachi plant emit?

Agha Steel Industries Karachi plant emits about 59,702 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,917 cars. That ranks #45 among tracked facilities in Pakistan.

Where is Agha Steel Industries Karachi plant located?

Agha Steel Industries Karachi plant is in Pakistan, near coordinates 24.84185, 67.31135.

Who operates Agha Steel Industries Karachi plant?

Agha Steel Industries Karachi plant is operated by Agha Steel Industries Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.