Cement Plant in Zambia. Approximate location -15.52249, 28.1666.
Cement PlantZambiaCO₂ reported
Scirocco Kafue Cement Plant is a cement plant in Zambia with a reported capacity of 910,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Scirocco Enterprises Ltd. By capacity it ranks #4 of 6 cement plants tracked in Zambia. It emits about 307,824 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 71,754 cars. Its CO₂ per unit of capacity is about 6% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439429.
عند 910,000 t of cement، يكون Scirocco Kafue Cement Plant حوالي متوسط cement plant في Zambia (1,000,000 t of cement). CO₂ لكل وحدة سعة هو تقريباً 6% أقل من متوسط cement plant. القطاع الفرعي: cement. كـ cement plant، يتطلب حرارة عملية مكثفة (عادة 800–1400°C) لعملياته الصناعية الأساسية — حرارة يجب توفيرها بواسطة الغلايات أو الأفران أو الاحتراق المباشر، والخسائر من خلال الحاويات والأنابيب غير المعزولة تمثل وقود مهدر. يمكن للعزل المعياري القابل للإزالة أن يقلل هذه الخسائر بمقدار 80-96٪، وتبريد الأسطح إلى ≤45°C، مع فترة استرجاع غالباً أقل من سنتين. تقوم مصانع الإسمنت بتسخين الحجر الجيري إلى 1,400°C في الأفران الدوارة — أحد أكثر العمليات الصناعية سخونة — ويجب التحكم في درجة الحرارة بدقة عبر طول الفرن كله.
مقارنة السعة وكثافة CO₂ محسوبة من بيانات منشآت Climate TRACE الصناعية؛ دور القطاع بناءً على مرجع الهندسة.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Scirocco Enterprises Ltd. All facilities by this operator →
Scirocco Kafue Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 15.5°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #4 largest of 6 cement plants in Zambia by reported capacity.
Coordinates -15.52249, 28.1666. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Scirocco Kafue Cement Plant is a cement plant in Zambia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Scirocco Kafue Cement Plant has a reported capacity of 910,000 t of cement.
Scirocco Kafue Cement Plant emits about 307,824 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 71,754 cars. That ranks #5 among tracked facilities in Zambia.
Scirocco Kafue Cement Plant is in Zambia, near coordinates -15.52249, 28.1666.
Scirocco Kafue Cement Plant is operated by Scirocco Enterprises Ltd.