Lime Plant in United States. Approximate location 41.07489, -79.98354.
Lime PlantUnited StatesCO₂ reported
Mercer Lime Co is a lime plant in United States with a reported capacity of 37,834 t of lime. It calcines limestone into quicklime in high-temperature kilns. By capacity it ranks #112 of 122 lime plants tracked in United States. It emits about 46,785 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 10,906 cars. Its CO₂ per unit of capacity is about 88% above the median lime plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38468894.
عند 37,834 t of lime، يكون Mercer Lime Co أقل من متوسط lime plant في United States (178,599 t of lime). القطاع الفرعي: lime. كـ lime plant، يتطلب حرارة عملية مكثفة (عادة 600–900°C) لعملياته الصناعية الأساسية — حرارة يجب توفيرها بواسطة الغلايات أو الأفران أو الاحتراق المباشر، والخسائر من خلال الحاويات والأنابيب غير المعزولة تمثل وقود مهدر. يمكن للعزل المعياري القابل للإزالة أن يقلل هذه الخسائر بمقدار 80-96٪، وتبريد الأسطح إلى ≤45°C، مع فترة استرجاع غالباً أقل من سنتين. تقوم مصانع الحجر الجيري بحرق الحجر الجيري في أفران ساخنة عند 800-900°C، ويجب التعامل مع الحجر الجيري الحي الساخن في حاويات معزولة لمنع التفاعل مع الرطوبة.
مقارنة السعة وكثافة CO₂ محسوبة من بيانات منشآت Climate TRACE الصناعية؛ دور القطاع بناءً على مرجع الهندسة.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of lime), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Mercer Lime Co sits in a warm-summer humid continental climate zone (Köppen Dfb), at 41.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #112 largest of 122 lime plants in United States by reported capacity.
Coordinates 41.07489, -79.98354. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Mercer Lime Co is a lime plant in United States. It calcines limestone into quicklime in high-temperature kilns.
Mercer Lime Co has a reported capacity of 37,834 t of lime.
Mercer Lime Co emits about 46,785 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 10,906 cars. That ranks #1073 among tracked facilities in United States.
Mercer Lime Co is in United States, near coordinates 41.07489, -79.98354.