Cement Plant in Bhutan. Approximate location 26.82182, 89.18314.
Cement PlantBhutanCO₂ reported
Lhaki Cement Gomtu Cement Plant is a cement plant in Bhutan with a reported capacity of 219,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lhaki Cement. By capacity it ranks #3 of 3 cement plants tracked in Bhutan. It emits about 107,531 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 25,066 cars. Its CO₂ per unit of capacity is about 36% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42545399.
عند 219,000 t of cement، يكون Lhaki Cement Gomtu Cement Plant أقل من متوسط cement plant في Bhutan (602,250 t of cement). CO₂ لكل وحدة سعة هو تقريباً 22% أعلى من متوسط cement plant. القطاع الفرعي: cement. كـ cement plant، يتطلب حرارة عملية مكثفة (عادة 800–1400°C) لعملياته الصناعية الأساسية — حرارة يجب توفيرها بواسطة الغلايات أو الأفران أو الاحتراق المباشر، والخسائر من خلال الحاويات والأنابيب غير المعزولة تمثل وقود مهدر. يمكن للعزل المعياري القابل للإزالة أن يقلل هذه الخسائر بمقدار 80-96٪، وتبريد الأسطح إلى ≤45°C، مع فترة استرجاع غالباً أقل من سنتين. تقوم مصانع الإسمنت بتسخين الحجر الجيري إلى 1,400°C في الأفران الدوارة — أحد أكثر العمليات الصناعية سخونة — ويجب التحكم في درجة الحرارة بدقة عبر طول الفرن كله.
مقارنة السعة وكثافة CO₂ محسوبة من بيانات منشآت Climate TRACE الصناعية؛ دور القطاع بناءً على مرجع الهندسة.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Lhaki Cement. All facilities by this operator →
Lhaki Cement Gomtu Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 26.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 3 cement plants in Bhutan by reported capacity.
Coordinates 26.82182, 89.18314. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Lhaki Cement Gomtu Cement Plant is a cement plant in Bhutan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Lhaki Cement Gomtu Cement Plant has a reported capacity of 219,000 t of cement.
Lhaki Cement Gomtu Cement Plant emits about 107,531 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 25,066 cars. That ranks #3 among tracked facilities in Bhutan.
Lhaki Cement Gomtu Cement Plant is in Bhutan, near coordinates 26.82182, 89.18314.
Lhaki Cement Gomtu Cement Plant is operated by Lhaki Cement.