Cement Plant in Belarus. Approximate location 53.73078, 31.72442.
Cement PlantBelarusCO₂ reported
Krichevcementnoshifer Cement Plant is a cement plant in Belarus with a reported capacity of 1,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Krichevcementnoshifer OJSC. By capacity it ranks #3 of 3 cement plants tracked in Belarus. It emits about 489,670 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 114,142 cars. Its CO₂ per unit of capacity is about 9% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437265.
عند 1,500,000 t of cement، يكون Krichevcementnoshifer Cement Plant حوالي متوسط cement plant في Belarus (1,600,000 t of cement). CO₂ لكل وحدة سعة هو تقريباً 5% أقل من متوسط cement plant. القطاع الفرعي: cement. كـ cement plant، يتطلب حرارة عملية مكثفة (عادة 800–1400°C) لعملياته الصناعية الأساسية — حرارة يجب توفيرها بواسطة الغلايات أو الأفران أو الاحتراق المباشر، والخسائر من خلال الحاويات والأنابيب غير المعزولة تمثل وقود مهدر. يمكن للعزل المعياري القابل للإزالة أن يقلل هذه الخسائر بمقدار 80-96٪، وتبريد الأسطح إلى ≤45°C، مع فترة استرجاع غالباً أقل من سنتين. تقوم مصانع الإسمنت بتسخين الحجر الجيري إلى 1,400°C في الأفران الدوارة — أحد أكثر العمليات الصناعية سخونة — ويجب التحكم في درجة الحرارة بدقة عبر طول الفرن كله.
مقارنة السعة وكثافة CO₂ محسوبة من بيانات منشآت Climate TRACE الصناعية؛ دور القطاع بناءً على مرجع الهندسة.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Krichevcementnoshifer OJSC. All facilities by this operator →
Krichevcementnoshifer Cement Plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 53.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 3 cement plants in Belarus by reported capacity.
Coordinates 53.73078, 31.72442. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Krichevcementnoshifer Cement Plant is a cement plant in Belarus. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Krichevcementnoshifer Cement Plant has a reported capacity of 1,500,000 t of cement.
Krichevcementnoshifer Cement Plant emits about 489,670 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 114,142 cars. That ranks #6 among tracked facilities in Belarus.
Krichevcementnoshifer Cement Plant is in Belarus, near coordinates 53.73078, 31.72442.
Krichevcementnoshifer Cement Plant is operated by Krichevcementnoshifer OJSC.