Cement Plant in Spain. Approximate location 36.61843, -6.07391.
Cement PlantSpainCO₂ reported
Jerez Cement Plant is a cement plant in Spain with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim España SAU. By capacity it ranks #21 of 29 cement plants tracked in Spain. It emits about 218,313 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 50,889 cars. Its CO₂ per unit of capacity is about 39% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896731.
عند 1,000,000 t of cement، يكون Jerez Cement Plant أقل من متوسط cement plant في Spain (1,361,000 t of cement). CO₂ لكل وحدة سعة هو تقريباً 24% أقل من متوسط cement plant. القطاع الفرعي: cement. كـ cement plant، يتطلب حرارة عملية مكثفة (عادة 800–1400°C) لعملياته الصناعية الأساسية — حرارة يجب توفيرها بواسطة الغلايات أو الأفران أو الاحتراق المباشر، والخسائر من خلال الحاويات والأنابيب غير المعزولة تمثل وقود مهدر. يمكن للعزل المعياري القابل للإزالة أن يقلل هذه الخسائر بمقدار 80-96٪، وتبريد الأسطح إلى ≤45°C، مع فترة استرجاع غالباً أقل من سنتين. تقوم مصانع الإسمنت بتسخين الحجر الجيري إلى 1,400°C في الأفران الدوارة — أحد أكثر العمليات الصناعية سخونة — ويجب التحكم في درجة الحرارة بدقة عبر طول الفرن كله.
مقارنة السعة وكثافة CO₂ محسوبة من بيانات منشآت Climate TRACE الصناعية؛ دور القطاع بناءً على مرجع الهندسة.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Holcim España SAU. All facilities by this operator →
Jerez Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 36.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #21 largest of 29 cement plants in Spain by reported capacity.
Coordinates 36.61843, -6.07391. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Jerez Cement Plant is a cement plant in Spain. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Jerez Cement Plant has a reported capacity of 1,000,000 t of cement.
Jerez Cement Plant emits about 218,313 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 50,889 cars. That ranks #48 among tracked facilities in Spain.
Jerez Cement Plant is in Spain, near coordinates 36.61843, -6.07391.
Jerez Cement Plant is operated by Holcim España SAU.