Holcim Garadagh Cement Plant

Cement Plant in Azerbaijan. Approximate location 40.22469, 49.55794.

Cement PlantAzerbaijanCO₂ reported

Holcim Garadagh Cement Plant is a cement plant in Azerbaijan with a reported capacity of 1,700,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim (Azerbaijan) OJSC. By capacity it ranks #2 of 3 cement plants tracked in Azerbaijan. It emits about 388,063 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 90,458 cars. Its CO₂ per unit of capacity is about 37% below the median cement plant.

1,700,000t of cement
388,063t CO₂e / yr (Climate TRACE)
#4CO₂ rank in Azerbaijan
0.23t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895164.

في السياق: كيف يتم مقارنة هذا المنشأة

عند 1,700,000 t of cement، يكون Holcim Garadagh Cement Plant حوالي متوسط cement plant في Azerbaijan (1,700,000 t of cement). CO₂ لكل وحدة سعة هو تقريباً 31% أقل من متوسط cement plant. القطاع الفرعي: cement. كـ cement plant، يتطلب حرارة عملية مكثفة (عادة 800–1400°C) لعملياته الصناعية الأساسية — حرارة يجب توفيرها بواسطة الغلايات أو الأفران أو الاحتراق المباشر، والخسائر من خلال الحاويات والأنابيب غير المعزولة تمثل وقود مهدر. يمكن للعزل المعياري القابل للإزالة أن يقلل هذه الخسائر بمقدار 80-96٪، وتبريد الأسطح إلى ≤45°C، مع فترة استرجاع غالباً أقل من سنتين. تقوم مصانع الإسمنت بتسخين الحجر الجيري إلى 1,400°C في الأفران الدوارة — أحد أكثر العمليات الصناعية سخونة — ويجب التحكم في درجة الحرارة بدقة عبر طول الفرن كله.

مقارنة السعة وكثافة CO₂ محسوبة من بيانات منشآت Climate TRACE الصناعية؛ دور القطاع بناءً على مرجع الهندسة.

What 388,063 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

90,458cars driven for a year
50,608homes' annual energy use
6,467,717tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Azerbaijan

Norm Sement Qizildas Cement Plant: 2,100,000 t of cement2.1MNorm Semen…Holcim Garadagh Cement Plant: 1,700,000 t of cement1.7MHolcim Gar…Arkoz Gazakh Cement Plant: 1,300,000 t of cement1.3MArkoz Gaza…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Holcim (Azerbaijan) OJSC. All facilities by this operator →

Local climate

Holcim Garadagh Cement Plant sits in a cold semi-arid steppe climate zone (Köppen BSk), at 40.2°N in the northern hemisphere.

~10°Ctypical annual mean
~23°Ctypical warm-season
Cold semi-arid steppe: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 3 cement plants in Azerbaijan by reported capacity.

Nearby industrial sites

Location

Coordinates 40.22469, 49.55794. View on OpenStreetMap.

Heat loss & insulation profile

A cement plant like this runs hot equipment that sheds heat continuously: rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves (surface/process temperatures around 200–1,000 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 9,800 MWh/yr (≈ 3,300 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.

See Inzonex insulation → Estimate your site →

Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.

Safety & the no-regret first step

Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.

External climate finance your country can access

Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:

Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.

Frequently asked questions

What type of facility is Holcim Garadagh Cement Plant?

Holcim Garadagh Cement Plant is a cement plant in Azerbaijan. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Holcim Garadagh Cement Plant?

Holcim Garadagh Cement Plant has a reported capacity of 1,700,000 t of cement.

How much CO₂ does Holcim Garadagh Cement Plant emit?

Holcim Garadagh Cement Plant emits about 388,063 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 90,458 cars. That ranks #4 among tracked facilities in Azerbaijan.

Where is Holcim Garadagh Cement Plant located?

Holcim Garadagh Cement Plant is in Azerbaijan, near coordinates 40.22469, 49.55794.

Who operates Holcim Garadagh Cement Plant?

Holcim Garadagh Cement Plant is operated by Holcim (Azerbaijan) OJSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.