Cement Plant in Belgium. Approximate location 50.60335, 3.49007.
Cement PlantBelgiumCO₂ reported
Gaurain Cement Plant is a cement plant in Belgium with a reported capacity of 2,300,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Compagnie Des Ciments Belges SA. By capacity it ranks #1 of 4 cement plants tracked in Belgium. It emits about 823,157 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 191,878 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895170.
عند 2,300,000 t of cement، يكون Gaurain Cement Plant أعلى بكثير من متوسط cement plant في Belgium (1,700,000 t of cement). القطاع الفرعي: cement. كـ cement plant، يتطلب حرارة عملية مكثفة (عادة 800–1400°C) لعملياته الصناعية الأساسية — حرارة يجب توفيرها بواسطة الغلايات أو الأفران أو الاحتراق المباشر، والخسائر من خلال الحاويات والأنابيب غير المعزولة تمثل وقود مهدر. يمكن للعزل المعياري القابل للإزالة أن يقلل هذه الخسائر بمقدار 80-96٪، وتبريد الأسطح إلى ≤45°C، مع فترة استرجاع غالباً أقل من سنتين. تقوم مصانع الإسمنت بتسخين الحجر الجيري إلى 1,400°C في الأفران الدوارة — أحد أكثر العمليات الصناعية سخونة — ويجب التحكم في درجة الحرارة بدقة عبر طول الفرن كله.
مقارنة السعة وكثافة CO₂ محسوبة من بيانات منشآت Climate TRACE الصناعية؛ دور القطاع بناءً على مرجع الهندسة.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Compagnie Des Ciments Belges SA. All facilities by this operator →
Gaurain Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 50.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 4 cement plants in Belgium by reported capacity.
Coordinates 50.60335, 3.49007. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Gaurain Cement Plant is a cement plant in Belgium. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Gaurain Cement Plant has a reported capacity of 2,300,000 t of cement.
Gaurain Cement Plant emits about 823,157 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 191,878 cars. That ranks #7 among tracked facilities in Belgium.
Gaurain Cement Plant is in Belgium, near coordinates 50.60335, 3.49007.
Gaurain Cement Plant is operated by Compagnie Des Ciments Belges SA.