Cement Plant in United Arab Emirates. Approximate location 25.55866, 55.98554.
Cement PlantUnited Arab EmiratesCO₂ reported
Al Banah Cement Plant is a cement plant in United Arab Emirates with a reported capacity of 3,200,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lafarge Emirates Cement Company LLC. By capacity it ranks #5 of 12 cement plants tracked in United Arab Emirates. It emits about 864,406 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 201,493 cars. Its CO₂ per unit of capacity is about 25% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895098.
عند 3,200,000 t of cement، يكون Al Banah Cement Plant حوالي متوسط cement plant في United Arab Emirates (2,700,000 t of cement). CO₂ لكل وحدة سعة هو تقريباً 33% أقل من متوسط cement plant. القطاع الفرعي: cement. كـ cement plant، يتطلب حرارة عملية مكثفة (عادة 800–1400°C) لعملياته الصناعية الأساسية — حرارة يجب توفيرها بواسطة الغلايات أو الأفران أو الاحتراق المباشر، والخسائر من خلال الحاويات والأنابيب غير المعزولة تمثل وقود مهدر. يمكن للعزل المعياري القابل للإزالة أن يقلل هذه الخسائر بمقدار 80-96٪، وتبريد الأسطح إلى ≤45°C، مع فترة استرجاع غالباً أقل من سنتين. تقوم مصانع الإسمنت بتسخين الحجر الجيري إلى 1,400°C في الأفران الدوارة — أحد أكثر العمليات الصناعية سخونة — ويجب التحكم في درجة الحرارة بدقة عبر طول الفرن كله.
مقارنة السعة وكثافة CO₂ محسوبة من بيانات منشآت Climate TRACE الصناعية؛ دور القطاع بناءً على مرجع الهندسة.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Lafarge Emirates Cement Company LLC. All facilities by this operator →
Al Banah Cement Plant sits in a hot desert climate zone (Köppen BWh), at 25.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #5 largest of 12 cement plants in United Arab Emirates by reported capacity.
Coordinates 25.55866, 55.98554. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Banah Cement Plant is a cement plant in United Arab Emirates. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Al Banah Cement Plant has a reported capacity of 3,200,000 t of cement.
Al Banah Cement Plant emits about 864,406 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 201,493 cars. That ranks #14 among tracked facilities in United Arab Emirates.
Al Banah Cement Plant is in United Arab Emirates, near coordinates 25.55866, 55.98554.
Al Banah Cement Plant is operated by Lafarge Emirates Cement Company LLC.