Steel Plant in Pakistan. Approximate location 24.84185, 67.31135.
Steel PlantPakistanCO₂ reported
Agha Steel Industries Karachi plant is a steel plant in Pakistan with a reported capacity of 450,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Agha Steel Industries Ltd. By capacity it ranks #5 of 5 steel plants tracked in Pakistan. It emits about 59,702 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,917 cars. Its CO₂ per unit of capacity is about 75% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567000.
عند 450,000 t of steel، يكون Agha Steel Industries Karachi plant أقل من متوسط steel plant في Pakistan (800,000 t of steel). CO₂ لكل وحدة سعة هو تقريباً 87% أقل من متوسط steel plant. القطاع الفرعي: iron-and-steel. كـ steel plant، يتطلب حرارة عملية مكثفة (عادة 800–1500°C) لعملياته الصناعية الأساسية — حرارة يجب توفيرها بواسطة الغلايات أو الأفران أو الاحتراق المباشر، والخسائر من خلال الحاويات والأنابيب غير المعزولة تمثل وقود مهدر. يمكن للعزل المعياري القابل للإزالة أن يقلل هذه الخسائر بمقدار 80-96٪، وتبريد الأسطح إلى ≤45°C، مع فترة استرجاع غالباً أقل من سنتين. تحرق مصانع الصلب الفحم في الأفران العالية أو تستخدم الأقواس الكهربائية لصهر الخردة؛ في كلا الحالتين يجب الاحتفاظ بالمعدن المذاب فوق 1,500°C ونقله عبر الأنابيب والحاويات الساخنة الواسعة.
مقارنة السعة وكثافة CO₂ محسوبة من بيانات منشآت Climate TRACE الصناعية؛ دور القطاع بناءً على مرجع الهندسة.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Agha Steel Industries Ltd. All facilities by this operator →
Agha Steel Industries Karachi plant sits in a hot desert climate zone (Köppen BWh), at 24.8°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #5 largest of 5 steel plants in Pakistan by reported capacity.
Coordinates 24.84185, 67.31135. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Agha Steel Industries Karachi plant is a steel plant in Pakistan. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Agha Steel Industries Karachi plant has a reported capacity of 450,000 t of steel.
Agha Steel Industries Karachi plant emits about 59,702 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,917 cars. That ranks #45 among tracked facilities in Pakistan.
Agha Steel Industries Karachi plant is in Pakistan, near coordinates 24.84185, 67.31135.
Agha Steel Industries Karachi plant is operated by Agha Steel Industries Ltd.