Steel Plant in Bangladesh. Approximate location 22.47052, 91.73551.
Steel PlantBangladeshCO₂ reported
Abul Khair Steel Sitakunda plant is a steel plant in Bangladesh with a reported capacity of 1,400,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Abul Khair Steel Ltd. By capacity it ranks #3 of 5 steel plants tracked in Bangladesh. It emits about 254,428 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 59,307 cars. Its CO₂ per unit of capacity is about 66% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566438.
عند 1,400,000 t of steel، يكون Abul Khair Steel Sitakunda plant حوالي متوسط steel plant في Bangladesh (1,400,000 t of steel). CO₂ لكل وحدة سعة هو تقريباً 43% أقل من متوسط steel plant. القطاع الفرعي: iron-and-steel. كـ steel plant، يتطلب حرارة عملية مكثفة (عادة 800–1500°C) لعملياته الصناعية الأساسية — حرارة يجب توفيرها بواسطة الغلايات أو الأفران أو الاحتراق المباشر، والخسائر من خلال الحاويات والأنابيب غير المعزولة تمثل وقود مهدر. يمكن للعزل المعياري القابل للإزالة أن يقلل هذه الخسائر بمقدار 80-96٪، وتبريد الأسطح إلى ≤45°C، مع فترة استرجاع غالباً أقل من سنتين. تحرق مصانع الصلب الفحم في الأفران العالية أو تستخدم الأقواس الكهربائية لصهر الخردة؛ في كلا الحالتين يجب الاحتفاظ بالمعدن المذاب فوق 1,500°C ونقله عبر الأنابيب والحاويات الساخنة الواسعة.
مقارنة السعة وكثافة CO₂ محسوبة من بيانات منشآت Climate TRACE الصناعية؛ دور القطاع بناءً على مرجع الهندسة.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Abul Khair Steel Ltd. All facilities by this operator →
Abul Khair Steel Sitakunda plant sits in a tropical monsoon climate zone (Köppen Am), at 22.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 5 steel plants in Bangladesh by reported capacity.
Coordinates 22.47052, 91.73551. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Abul Khair Steel Sitakunda plant is a steel plant in Bangladesh. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Abul Khair Steel Sitakunda plant has a reported capacity of 1,400,000 t of steel.
Abul Khair Steel Sitakunda plant emits about 254,428 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 59,307 cars. That ranks #8 among tracked facilities in Bangladesh.
Abul Khair Steel Sitakunda plant is in Bangladesh, near coordinates 22.47052, 91.73551.
Abul Khair Steel Sitakunda plant is operated by Abul Khair Steel Ltd.