Home / Türkiye / Steel plants / Yesilyurt Iron and Steel Tekkekoy plant

Yesilyurt Iron and Steel Tekkekoy plant

Steel Plant in Türkiye. Approximate location 41.24035, 36.44048.

Steel PlantTürkiyeCO₂ reported

Yesilyurt Iron and Steel Tekkekoy plant is a steel plant in Türkiye with a reported capacity of 1,300,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Yesilyurt Demir Celik Endustri Ve Liman Isletmeleri AŞ. By capacity it ranks #14 of 26 steel plants tracked in Türkiye. It emits about 82,763 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 19,292 cars. Its CO₂ per unit of capacity is about 88% below the median steel plant.

1,300,000t of steel
82,763t CO₂e / yr (Climate TRACE)
#87CO₂ rank in Türkiye
0.06t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567082.

在上下文中:该设施如何比较

在1,300,000 t of steel时,Yesilyurt Iron and Steel Tekkekoy plant是Türkiye中steel plant的中位数约 1,400,000 t of steel。 其单位容量的CO₂约为steel plant中位数的低于 32%。 子部门:iron-and-steel。 作为steel plant,它需要强烈的工艺热量(通常800–1500°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 钢铁厂在高炉中燃烧煤炭或使用电弧熔化废料;在两种情况下,熔融金属都必须保持在1,500°C以上并通过广泛的热管和容器转移。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 82,763 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

19,292cars driven for a year
10,793homes' annual energy use
1,379,383tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Türkiye

Isdemir Payas steel plant: 5,800,000 t of steel5.8MIsdemir Pa…İÇDAŞ Biga steel plant: 5,001,000 t of steel5.0MİÇDAŞ Biga…Colakoglu Metallurgical Dilovasi plant: 4,500,000 t of steel4.5MColakoglu …Habas Aliaga steel plant: 4,500,000 t of steel4.5MHabas Alia…Toscelik Iskenderun steel plant: 4,000,000 t of steel4.0MToscelik I…Erdemir Eregli steel plant: 3,801,000 t of steel3.8MErdemir Er…Kardemir Merkez steel plant: 3,501,000 t of steel3.5MKardemir M…MMK Türkiye Metallurgical Payas plant: 2,500,000 t of steel2.5MMMK Türkiy…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Yesilyurt Demir Celik Endustri Ve Liman Isletmeleri AŞ. All facilities by this operator →

Local climate

Yesilyurt Iron and Steel Tekkekoy plant sits in a temperate oceanic climate zone (Köppen Cfb), at 41.2°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #14 largest of 26 steel plants in Türkiye by reported capacity.

Nearby industrial sites

Location

Coordinates 41.24035, 36.44048. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Yesilyurt Iron and Steel Tekkekoy plant?

Yesilyurt Iron and Steel Tekkekoy plant is a steel plant in Türkiye. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Yesilyurt Iron and Steel Tekkekoy plant?

Yesilyurt Iron and Steel Tekkekoy plant has a reported capacity of 1,300,000 t of steel.

How much CO₂ does Yesilyurt Iron and Steel Tekkekoy plant emit?

Yesilyurt Iron and Steel Tekkekoy plant emits about 82,763 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 19,292 cars. That ranks #87 among tracked facilities in Türkiye.

Where is Yesilyurt Iron and Steel Tekkekoy plant located?

Yesilyurt Iron and Steel Tekkekoy plant is in Türkiye, near coordinates 41.24035, 36.44048.

Who operates Yesilyurt Iron and Steel Tekkekoy plant?

Yesilyurt Iron and Steel Tekkekoy plant is operated by Yesilyurt Demir Celik Endustri Ve Liman Isletmeleri AŞ.

Built from open public data; no personal information. Operate this site? Request a correction or removal.