Cement Plant in Switzerland. Approximate location 46.91711, 9.55104.
Cement PlantSwitzerlandCO₂ reported
Untervaz Cement Plant is a cement plant in Switzerland with a reported capacity of 800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim (Schweiz) AG. By capacity it ranks #3 of 6 cement plants tracked in Switzerland. It emits about 356,766 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 83,162 cars. Its CO₂ per unit of capacity is about 24% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437353.
在800,000 t of cement时,Untervaz Cement Plant是Switzerland中cement plant的中位数约 800,000 t of cement。 其单位容量的CO₂约为cement plant中位数的高于 44%。 子部门:cement。 作为cement plant,它需要强烈的工艺热量(通常800–1400°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 水泥厂在回转窑中将石灰石加热到1,400°C——是最热的工业过程之一——必须在整个窑长上精确控制温度。
容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Holcim (Schweiz) AG. All facilities by this operator →
Untervaz Cement Plant sits in a polar tundra climate zone (Köppen ET), at 46.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 6 cement plants in Switzerland by reported capacity.
Coordinates 46.91711, 9.55104. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Untervaz Cement Plant is a cement plant in Switzerland. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Untervaz Cement Plant has a reported capacity of 800,000 t of cement.
Untervaz Cement Plant emits about 356,766 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 83,162 cars. That ranks #2 among tracked facilities in Switzerland.
Untervaz Cement Plant is in Switzerland, near coordinates 46.91711, 9.55104.
Untervaz Cement Plant is operated by Holcim (Schweiz) AG.