Home / Europe / Switzerland / Steel plants / Stahl Gerlafingen steel plant

Stahl Gerlafingen steel plant

Steel Plant in Switzerland. Approximate location 47.17283, 7.56332.

Steel PlantSwitzerlandCO₂ reported

Stahl Gerlafingen steel plant is a steel plant in Switzerland with a reported capacity of 720,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Stahl Gerlafingen AG. By capacity it ranks #1 of 2 steel plants tracked in Switzerland. It emits about 50,453 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 11,761 cars. Its CO₂ per unit of capacity is about 87% below the median steel plant.

720,000t of steel
50,453t CO₂e / yr (Climate TRACE)
#14CO₂ rank in Switzerland
0.07t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566476.

在上下文中:该设施如何比较

在720,000 t of steel时,Stahl Gerlafingen steel plant是Switzerland中steel plant的中位数约 720,000 t of steel。 子部门:iron-and-steel。 作为steel plant,它需要强烈的工艺热量(通常800–1500°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 钢铁厂在高炉中燃烧煤炭或使用电弧熔化废料;在两种情况下,熔融金属都必须保持在1,500°C以上并通过广泛的热管和容器转移。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 50,453 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

11,761cars driven for a year
6,580homes' annual energy use
840,883tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Switzerland

Stahl Gerlafingen steel plant: 720,000 t of steel720kStahl Gerl…Swiss Steel Emmenbrücke plant: 650,000 t of steel650kSwiss Stee…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Stahl Gerlafingen AG. All facilities by this operator →

Local climate

Stahl Gerlafingen steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 47.2°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 2 steel plants in Switzerland by reported capacity.

Nearby industrial sites

Location

Coordinates 47.17283, 7.56332. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Stahl Gerlafingen steel plant?

Stahl Gerlafingen steel plant is a steel plant in Switzerland. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Stahl Gerlafingen steel plant?

Stahl Gerlafingen steel plant has a reported capacity of 720,000 t of steel.

How much CO₂ does Stahl Gerlafingen steel plant emit?

Stahl Gerlafingen steel plant emits about 50,453 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 11,761 cars. That ranks #14 among tracked facilities in Switzerland.

Where is Stahl Gerlafingen steel plant located?

Stahl Gerlafingen steel plant is in Switzerland, near coordinates 47.17283, 7.56332.

Who operates Stahl Gerlafingen steel plant?

Stahl Gerlafingen steel plant is operated by Stahl Gerlafingen AG.

Built from open public data; no personal information. Operate this site? Request a correction or removal.