Home / Europe / Germany / Steel plants / Salzgitter Peiner Träger Peine steel plant

Salzgitter Peiner Träger Peine steel plant

Steel Plant in Germany. Approximate location 52.31667, 10.24469.

Steel PlantGermanyCO₂ reported

Salzgitter Peiner Träger Peine steel plant is a steel plant in Germany with a reported capacity of 1,000,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Peiner Traeger GmbH. By capacity it ranks #15 of 19 steel plants tracked in Germany. It emits about 59,812 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,942 cars. Its CO₂ per unit of capacity is about 89% below the median steel plant.

1,000,000t of steel
59,812t CO₂e / yr (Climate TRACE)
#165CO₂ rank in Germany
0.06t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566783.

在上下文中:该设施如何比较

在1,000,000 t of steel时,Salzgitter Peiner Träger Peine steel plant是Germany中steel plant的中位数低于 1,400,000 t of steel。 子部门:iron-and-steel。 作为steel plant,它需要强烈的工艺热量(通常800–1500°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 钢铁厂在高炉中燃烧煤炭或使用电弧熔化废料;在两种情况下,熔融金属都必须保持在1,500°C以上并通过广泛的热管和容器转移。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 59,812 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

13,942cars driven for a year
7,800homes' annual energy use
996,867tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Germany

ThyssenKrupp Steel Duisburg steel plant: 11,000,000 t of steel11.0MThyssenKru…Hüttenwerke Krupp Mannesmann (HKM) steel plant: 6,300,000 t of steel6.3MHüttenwerk…Salzgitter Flachstahl steel plant: 5,200,000 t of steel5.2MSalzgitter…ArcelorMittal Bremen steel plant: 3,800,000 t of steel3.8MArcelorMit…Saarstahl Völklingen Steelmaking Plant: 3,240,000 t of steel3.2MSaarstahl …AG der Dillinger Hüttenwerke Dillingen steel plant: 2,760,000 t of steel2.8MAG der Dil…Kehler Baden Steel Works: 2,500,000 t of steel2.5MKehler Bad…ArcelorMittal Eisenhüttenstadt steel plant: 2,400,000 t of steel2.4MArcelorMit…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Peiner Traeger GmbH. All facilities by this operator →

Local climate

Salzgitter Peiner Träger Peine steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 52.3°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #15 largest of 19 steel plants in Germany by reported capacity.

Nearby industrial sites

Location

Coordinates 52.31667, 10.24469. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Salzgitter Peiner Träger Peine steel plant?

Salzgitter Peiner Träger Peine steel plant is a steel plant in Germany. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Salzgitter Peiner Träger Peine steel plant?

Salzgitter Peiner Träger Peine steel plant has a reported capacity of 1,000,000 t of steel.

How much CO₂ does Salzgitter Peiner Träger Peine steel plant emit?

Salzgitter Peiner Träger Peine steel plant emits about 59,812 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,942 cars. That ranks #165 among tracked facilities in Germany.

Where is Salzgitter Peiner Träger Peine steel plant located?

Salzgitter Peiner Träger Peine steel plant is in Germany, near coordinates 52.31667, 10.24469.

Who operates Salzgitter Peiner Träger Peine steel plant?

Salzgitter Peiner Träger Peine steel plant is operated by Peiner Traeger GmbH.

Built from open public data; no personal information. Operate this site? Request a correction or removal.