Home / South America / Brazil / Cement plants / Pinheiro Machado Cement Plant

Pinheiro Machado Cement Plant

Cement Plant in Brazil. Approximate location -31.51358, -53.55917.

Cement PlantBrazilCO₂ reported

Pinheiro Machado Cement Plant is a cement plant in Brazil with a reported capacity of 450,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Votorantim Cimentos SA. By capacity it ranks #50 of 57 cement plants tracked in Brazil. It emits about 180,310 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 42,030 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.

450,000t of cement
180,310t CO₂e / yr (Climate TRACE)
#109CO₂ rank in Brazil
0.40t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437323.

在上下文中:该设施如何比较

在450,000 t of cement时,Pinheiro Machado Cement Plant是Brazil中cement plant的中位数低于 1,461,000 t of cement。 其单位容量的CO₂约为cement plant中位数的高于 23%。 子部门:cement。 作为cement plant,它需要强烈的工艺热量(通常800–1400°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 水泥厂在回转窑中将石灰石加热到1,400°C——是最热的工业过程之一——必须在整个窑长上精确控制温度。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 180,310 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

42,030cars driven for a year
23,515homes' annual energy use
3,005,167tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Brazil

Rio Branco do Sul Cement Plant: 7,000,000 t of cement7.0MRio Branco…Lagoa Santa Cement Plant: 4,900,000 t of cement4.9MLagoa Sant…Salto de Pirapora Cement Plant: 4,800,000 t of cement4.8MSalto de P…Ciplam Sobradinho Cement Plant: 3,800,000 t of cement3.8MCiplam Sob…Carandaí Cement Plant: 3,400,000 t of cement3.4MCarandaí C…Barroso Cement Plant: 3,200,000 t of cement3.2MBarroso Ce…Apiai Cement Plant: 3,200,000 t of cement3.2MApiai Ceme…Balsa nova Cement Plant: 2,800,000 t of cement2.8MBalsa nova…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Votorantim Cimentos SA. All facilities by this operator →

Local climate

Pinheiro Machado Cement Plant sits in a humid subtropical climate zone (Köppen Cfa), at 31.5°S in the southern hemisphere.

~18°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #50 largest of 57 cement plants in Brazil by reported capacity.

Nearby industrial sites

Location

Coordinates -31.51358, -53.55917. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Pinheiro Machado Cement Plant?

Pinheiro Machado Cement Plant is a cement plant in Brazil. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Pinheiro Machado Cement Plant?

Pinheiro Machado Cement Plant has a reported capacity of 450,000 t of cement.

How much CO₂ does Pinheiro Machado Cement Plant emit?

Pinheiro Machado Cement Plant emits about 180,310 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 42,030 cars. That ranks #109 among tracked facilities in Brazil.

Where is Pinheiro Machado Cement Plant located?

Pinheiro Machado Cement Plant is in Brazil, near coordinates -31.51358, -53.55917.

Who operates Pinheiro Machado Cement Plant?

Pinheiro Machado Cement Plant is operated by Votorantim Cimentos SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.