Cement Plant in Australia. Approximate location -34.51014, 150.33322.
Cement PlantAustraliaCO₂ reported
New Berrima Cement Plant is a cement plant in Australia with a reported capacity of 1,500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Boral Cement Ltd. By capacity it ranks #3 of 5 cement plants tracked in Australia. It emits about 292,619 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 68,210 cars. Its CO₂ per unit of capacity is about 46% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895142.
在1,500,000 t of cement时,New Berrima Cement Plant是Australia中cement plant的中位数约 1,500,000 t of cement。 其单位容量的CO₂约为cement plant中位数的低于 44%。 子部门:cement。 作为cement plant,它需要强烈的工艺热量(通常800–1400°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 水泥厂在回转窑中将石灰石加热到1,400°C——是最热的工业过程之一——必须在整个窑长上精确控制温度。
容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Boral Cement Ltd. All facilities by this operator →
New Berrima Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 34.5°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 5 cement plants in Australia by reported capacity.
Coordinates -34.51014, 150.33322. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

New Berrima Cement Plant is a cement plant in Australia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
New Berrima Cement Plant has a reported capacity of 1,500,000 t of cement.
New Berrima Cement Plant emits about 292,619 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 68,210 cars. That ranks #26 among tracked facilities in Australia.
New Berrima Cement Plant is in Australia, near coordinates -34.51014, 150.33322.
New Berrima Cement Plant is operated by Boral Cement Ltd.