Home / Africa / Niger / Cement plants / Malbaza Cement Plant

Malbaza Cement Plant

Cement Plant in Niger. Approximate location 13.95161, 5.51911.

Cement PlantNigerCO₂ reported

Malbaza Cement Plant is a cement plant in Niger with a reported capacity of 650,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Malbaza Cement Company SA. By capacity it ranks #2 of 2 cement plants tracked in Niger. It emits about 238,828 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 55,671 cars.

650,000t of cement
238,828t CO₂e / yr (Climate TRACE)
#2CO₂ rank in Niger
0.37t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438951.

在上下文中:该设施如何比较

在650,000 t of cement时,Malbaza Cement Plant是Niger中cement plant的中位数低于 1,000,000 t of cement。 子部门:cement。 作为cement plant,它需要强烈的工艺热量(通常800–1400°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 水泥厂在回转窑中将石灰石加热到1,400°C——是最热的工业过程之一——必须在整个窑长上精确控制温度。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 238,828 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

55,671cars driven for a year
31,146homes' annual energy use
3,980,467tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Niger

Badaguichiri Cement Plant: 1,000,000 t of cement1000kBadaguichi…Malbaza Cement Plant: 650,000 t of cement650kMalbaza Ce…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Malbaza Cement Company SA. All facilities by this operator →

Local climate

Malbaza Cement Plant sits in a hot semi-arid steppe climate zone (Köppen BSh), at 14.0°N in the northern hemisphere.

~23°Ctypical annual mean
~31°Ctypical warm-season
Hot semi-arid steppe: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 2 cement plants in Niger by reported capacity.

Nearby industrial sites

Location

Coordinates 13.95161, 5.51911. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Malbaza Cement Plant?

Malbaza Cement Plant is a cement plant in Niger. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Malbaza Cement Plant?

Malbaza Cement Plant has a reported capacity of 650,000 t of cement.

How much CO₂ does Malbaza Cement Plant emit?

Malbaza Cement Plant emits about 238,828 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 55,671 cars. That ranks #2 among tracked facilities in Niger.

Where is Malbaza Cement Plant located?

Malbaza Cement Plant is in Niger, near coordinates 13.95161, 5.51911.

Who operates Malbaza Cement Plant?

Malbaza Cement Plant is operated by Malbaza Cement Company SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.