Cement Plant in Ecuador. Approximate location -2.17912, -80.04192.
Cement PlantEcuadorCO₂ reported
Guayaquil Cement Plant is a cement plant in Ecuador with a reported capacity of 5,400,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim (Ecuador) SA. By capacity it ranks #1 of 4 cement plants tracked in Ecuador. It emits about 2,173,984 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 506,756 cars. Its CO₂ per unit of capacity is about 12% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896668.
在5,400,000 t of cement时,Guayaquil Cement Plant是Ecuador中cement plant的中位数远高于 1,400,000 t of cement。 子部门:cement。 作为cement plant,它需要强烈的工艺热量(通常800–1400°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 水泥厂在回转窑中将石灰石加热到1,400°C——是最热的工业过程之一——必须在整个窑长上精确控制温度。
容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Holcim (Ecuador) SA. All facilities by this operator →
Guayaquil Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 2.2°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 4 cement plants in Ecuador by reported capacity.
Coordinates -2.17912, -80.04192. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Guayaquil Cement Plant is a cement plant in Ecuador. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Guayaquil Cement Plant has a reported capacity of 5,400,000 t of cement.
Guayaquil Cement Plant emits about 2,173,984 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 506,756 cars. That ranks #1 among tracked facilities in Ecuador.
Guayaquil Cement Plant is in Ecuador, near coordinates -2.17912, -80.04192.
Guayaquil Cement Plant is operated by Holcim (Ecuador) SA.