Home / Europe / Serbia / Cement plants / Galovici Cement Plant

Galovici Cement Plant

Cement Plant in Serbia. Approximate location 44.01105, 19.88937.

Cement PlantSerbiaCO₂ reported

Galovici Cement Plant is a cement plant in Serbia with a reported capacity of 750,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Cementara Kosjerić AD. By capacity it ranks #3 of 3 cement plants tracked in Serbia. It emits about 179,998 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 41,958 cars. Its CO₂ per unit of capacity is about 33% below the median cement plant.

750,000t of cement
179,998t CO₂e / yr (Climate TRACE)
#6CO₂ rank in Serbia
0.24t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439130.

在上下文中:该设施如何比较

在750,000 t of cement时,Galovici Cement Plant是Serbia中cement plant的中位数低于 1,000,000 t of cement。 子部门:cement。 作为cement plant,它需要强烈的工艺热量(通常800–1400°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 水泥厂在回转窑中将石灰石加热到1,400°C——是最热的工业过程之一——必须在整个窑长上精确控制温度。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 179,998 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

41,958cars driven for a year
23,474homes' annual energy use
2,999,967tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Serbia

Popovac Cement Plant: 1,350,000 t of cement1.4MPopovac Ce…Beocin Cement Plant: 1,000,000 t of cement1000kBeocin Cem…Galovici Cement Plant: 750,000 t of cement750kGalovici C…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Cementara Kosjerić AD. All facilities by this operator →

Local climate

Galovici Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 44.0°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #3 largest of 3 cement plants in Serbia by reported capacity.

Nearby industrial sites

Location

Coordinates 44.01105, 19.88937. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Galovici Cement Plant?

Galovici Cement Plant is a cement plant in Serbia. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Galovici Cement Plant?

Galovici Cement Plant has a reported capacity of 750,000 t of cement.

How much CO₂ does Galovici Cement Plant emit?

Galovici Cement Plant emits about 179,998 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 41,958 cars. That ranks #6 among tracked facilities in Serbia.

Where is Galovici Cement Plant located?

Galovici Cement Plant is in Serbia, near coordinates 44.01105, 19.88937.

Who operates Galovici Cement Plant?

Galovici Cement Plant is operated by Cementara Kosjerić AD.

Built from open public data; no personal information. Operate this site? Request a correction or removal.