Home / Africa / Egypt / Cement plants / El Sewedy Cement Attaka Plant

El Sewedy Cement Attaka Plant

Cement Plant in Egypt. Approximate location 29.74765, 32.21266.

Cement PlantEgyptCO₂ reported

El Sewedy Cement Attaka Plant is a cement plant in Egypt with a reported capacity of 3,400,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by El Sewedy Cement Co. By capacity it ranks #9 of 26 cement plants tracked in Egypt. It emits about 713,960 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 166,424 cars. Its CO₂ per unit of capacity is about 42% below the median cement plant.

3,400,000t of cement
713,960t CO₂e / yr (Climate TRACE)
#28CO₂ rank in Egypt
0.21t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896694.

在上下文中:该设施如何比较

在3,400,000 t of cement时,El Sewedy Cement Attaka Plant是Egypt中cement plant的中位数远高于 2,690,000 t of cement。 其单位容量的CO₂约为cement plant中位数的低于 41%。 子部门:cement。 作为cement plant,它需要强烈的工艺热量(通常800–1400°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 水泥厂在回转窑中将石灰石加热到1,400°C——是最热的工业过程之一——必须在整个窑长上精确控制温度。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 713,960 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

166,424cars driven for a year
93,109homes' annual energy use
11,899,333tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Egypt

National Cement New Beni Suef Cement Plant: 12,000,000 t of cement12.0MNational C…Lafarge Attaka Cement Plant: 10,200,000 t of cement10.2MLafarge At…Helwan Cement Plant: 8,000,000 t of cement8.0MHelwan Cem…National Cement El Hassana Cement Plant: 7,000,000 t of cement7.0MNational C…Assiuit Cement Asyut Plant: 5,700,000 t of cement5.7MAssiuit Ce…Arabian Cement Attaka Plant: 5,000,000 t of cement5.0MArabian Ce…Borg El Arab Cement Plant: 4,800,000 t of cement4.8MBorg El Ar…Tura Cement Plant: 4,000,000 t of cement4.0MTura Cemen…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by El Sewedy Cement Co. All facilities by this operator →

Local climate

El Sewedy Cement Attaka Plant sits in a hot desert climate zone (Köppen BWh), at 29.7°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #9 largest of 26 cement plants in Egypt by reported capacity.

Nearby industrial sites

Location

Coordinates 29.74765, 32.21266. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is El Sewedy Cement Attaka Plant?

El Sewedy Cement Attaka Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of El Sewedy Cement Attaka Plant?

El Sewedy Cement Attaka Plant has a reported capacity of 3,400,000 t of cement.

How much CO₂ does El Sewedy Cement Attaka Plant emit?

El Sewedy Cement Attaka Plant emits about 713,960 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 166,424 cars. That ranks #28 among tracked facilities in Egypt.

Where is El Sewedy Cement Attaka Plant located?

El Sewedy Cement Attaka Plant is in Egypt, near coordinates 29.74765, 32.21266.

Who operates El Sewedy Cement Attaka Plant?

El Sewedy Cement Attaka Plant is operated by El Sewedy Cement Co.

Built from open public data; no personal information. Operate this site? Request a correction or removal.