Cement Plant in Mexico. Approximate location 16.88772, -99.82989.
Cement PlantMexicoCO₂ reported
Acapulco Cement Plant is a cement plant in Mexico with a reported capacity of 600,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Holcim México Operaciones SA de CV. By capacity it ranks #31 of 35 cement plants tracked in Mexico. It emits about 195,572 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 45,588 cars. Its CO₂ per unit of capacity is about 9% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438919.
在600,000 t of cement时,Acapulco Cement Plant是Mexico中cement plant的中位数低于 1,300,000 t of cement。 其单位容量的CO₂约为cement plant中位数的高于 21%。 子部门:cement。 作为cement plant,它需要强烈的工艺热量(通常800–1400°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 水泥厂在回转窑中将石灰石加热到1,400°C——是最热的工业过程之一——必须在整个窑长上精确控制温度。
容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Holcim México Operaciones SA de CV. All facilities by this operator →
Acapulco Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 16.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #31 largest of 35 cement plants in Mexico by reported capacity.
Coordinates 16.88772, -99.82989. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Acapulco Cement Plant is a cement plant in Mexico. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Acapulco Cement Plant has a reported capacity of 600,000 t of cement.
Acapulco Cement Plant emits about 195,572 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 45,588 cars. That ranks #42 among tracked facilities in Mexico.
Acapulco Cement Plant is in Mexico, near coordinates 16.88772, -99.82989.
Acapulco Cement Plant is operated by Holcim México Operaciones SA de CV.