Cement Plant in Germany. Approximate location 51.59858, 8.34965.
Cement PlantGermanyCO₂ reported
Thomas Erwitte Cement Plant is a cement plant in Germany with a reported capacity of 500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Thomas Zement GmbH & Co KG. By capacity it ranks #26 of 32 cement plants tracked in Germany. It emits about 200,445 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 46,724 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42546167.
При потужності 500,000 t of cement Thomas Erwitte Cement Plant — це нижче медіана cement plant у Germany (1,000,000 t of cement). Його викидання CO₂ на одиницю потужності приблизно на 26% вище медіани cement plant. Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Thomas Zement GmbH & Co KG. All facilities by this operator →
Thomas Erwitte Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 51.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #26 largest of 32 cement plants in Germany by reported capacity.
Coordinates 51.59858, 8.34965. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Thomas Erwitte Cement Plant is a cement plant in Germany. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Thomas Erwitte Cement Plant has a reported capacity of 500,000 t of cement.
Thomas Erwitte Cement Plant emits about 200,445 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 46,724 cars. That ranks #68 among tracked facilities in Germany.
Thomas Erwitte Cement Plant is in Germany, near coordinates 51.59858, 8.34965.
Thomas Erwitte Cement Plant is operated by Thomas Zement GmbH & Co KG.