Home / Europe / Germany / Cement plants / Thomas Erwitte Cement Plant

Thomas Erwitte Cement Plant

Cement Plant in Germany. Approximate location 51.59858, 8.34965.

Cement PlantGermanyCO₂ reported

Thomas Erwitte Cement Plant is a cement plant in Germany with a reported capacity of 500,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Thomas Zement GmbH & Co KG. By capacity it ranks #26 of 32 cement plants tracked in Germany. It emits about 200,445 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 46,724 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.

500,000t of cement
200,445t CO₂e / yr (Climate TRACE)
#68CO₂ rank in Germany
0.40t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42546167.

У контексті: як порівнюється це підприємство

При потужності 500,000 t of cement Thomas Erwitte Cement Plant — це нижче медіана cement plant у Germany (1,000,000 t of cement). Його викидання CO₂ на одиницю потужності приблизно на 26% вище медіани cement plant. Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.

Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.

What 200,445 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

46,724cars driven for a year
26,140homes' annual energy use
3,340,750tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Germany

Deuna Cement Plant: 2,000,000 t of cement2.0MDeuna Ceme…Rudersdorf Cement Plant: 1,900,000 t of cement1.9MRudersdorf…Lengerich Cement Plant: 1,770,000 t of cement1.8MLengerich …Karsdorf Cement Plant: 1,400,000 t of cement1.4MKarsdorf C…Schelklingen Cement Plant: 1,400,000 t of cement1.4MSchelkling…Lagerdorf Cement Plant: 1,310,000 t of cement1.3MLagerdorf …Beckum-Kollenbach Cement Plant: 1,250,000 t of cement1.2MBeckum-Kol…Karlstadt Cement Plant: 1,200,000 t of cement1.2MKarlstadt …

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Thomas Zement GmbH & Co KG. All facilities by this operator →

Local climate

Thomas Erwitte Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 51.6°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #26 largest of 32 cement plants in Germany by reported capacity.

Nearby industrial sites

Location

Coordinates 51.59858, 8.34965. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Thomas Erwitte Cement Plant?

Thomas Erwitte Cement Plant is a cement plant in Germany. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Thomas Erwitte Cement Plant?

Thomas Erwitte Cement Plant has a reported capacity of 500,000 t of cement.

How much CO₂ does Thomas Erwitte Cement Plant emit?

Thomas Erwitte Cement Plant emits about 200,445 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 46,724 cars. That ranks #68 among tracked facilities in Germany.

Where is Thomas Erwitte Cement Plant located?

Thomas Erwitte Cement Plant is in Germany, near coordinates 51.59858, 8.34965.

Who operates Thomas Erwitte Cement Plant?

Thomas Erwitte Cement Plant is operated by Thomas Zement GmbH & Co KG.

Built from open public data; no personal information. Operate this site? Request a correction or removal.