Steel Plant in Saudi Arabia. Approximate location 27.01809, 49.57932.
Steel PlantSaudi ArabiaCO₂ reported
SABIC Hadeed Al Jubail steel plant is a steel plant in Saudi Arabia with a reported capacity of 6,000,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Saudi Iron and Steel Co. By capacity it ranks #1 of 6 steel plants tracked in Saudi Arabia. It emits about 3,619,273 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 843,653 cars. Its CO₂ per unit of capacity is about 12% above the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567040.
При потужності 6,000,000 t of steel SABIC Hadeed Al Jubail steel plant — це значно вище медіана steel plant у Saudi Arabia (1,200,000 t of steel). Його викидання CO₂ на одиницю потужності приблизно на 11% вище медіани steel plant. Підсектор: iron-and-steel. Як steel plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1500°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Сталеливарні заводи спалюють вугілля у доменних печах або використовують електричні дуги для плавлення брухту; в обох випадках розплавлений метал повинен перебувати вище 1500°C і транспортуватися через розширені гарячі трубопроводи та судини.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Saudi Iron and Steel Co. All facilities by this operator →
SABIC Hadeed Al Jubail steel plant sits in a hot desert climate zone (Köppen BWh), at 27.0°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 6 steel plants in Saudi Arabia by reported capacity.
Coordinates 27.01809, 49.57932. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

SABIC Hadeed Al Jubail steel plant is a steel plant in Saudi Arabia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
SABIC Hadeed Al Jubail steel plant has a reported capacity of 6,000,000 t of steel.
SABIC Hadeed Al Jubail steel plant emits about 3,619,273 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 843,653 cars. That ranks #6 among tracked facilities in Saudi Arabia.
SABIC Hadeed Al Jubail steel plant is in Saudi Arabia, near coordinates 27.01809, 49.57932.
SABIC Hadeed Al Jubail steel plant is operated by Saudi Iron and Steel Co.