Cement Plant in Tanzania. Approximate location -10.2589, 40.04132.
Cement PlantTanzaniaCO₂ reported
Mtwara Cement Plant is a cement plant in Tanzania with a reported capacity of 3,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Dangote Cement PLC. By capacity it ranks #1 of 6 cement plants tracked in Tanzania. It emits about 1,107,966 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 258,267 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897926.
При потужності 3,000,000 t of cement Mtwara Cement Plant — це значно вище медіана cement plant у Tanzania (1,100,000 t of cement). Його викидання CO₂ на одиницю потужності приблизно на 22% нижче медіани cement plant. Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Dangote Cement PLC. All facilities by this operator →
Mtwara Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 10.3°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 6 cement plants in Tanzania by reported capacity.
Coordinates -10.2589, 40.04132. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Mtwara Cement Plant is a cement plant in Tanzania. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Mtwara Cement Plant has a reported capacity of 3,000,000 t of cement.
Mtwara Cement Plant emits about 1,107,966 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 258,267 cars. That ranks #1 among tracked facilities in Tanzania.
Mtwara Cement Plant is in Tanzania, near coordinates -10.2589, 40.04132.
Mtwara Cement Plant is operated by Dangote Cement PLC.