Cement Plant in Congo. Approximate location -4.24236, 14.36285.
Cement PlantCongoCO₂ reported
Mindouli Cement Plant is a cement plant in Congo with a reported capacity of 700,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Diamond Cement Congo SA. By capacity it ranks #1 of 3 cement plants tracked in Congo. It emits about 280,568 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 65,400 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896551.
При потужності 700,000 t of cement Mindouli Cement Plant — це значно вище медіана cement plant у Congo (300,000 t of cement). Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Diamond Cement Congo SA. All facilities by this operator →
Mindouli Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 4.2°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #1 largest of 3 cement plants in Congo by reported capacity.
Coordinates -4.24236, 14.36285. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Mindouli Cement Plant is a cement plant in Congo. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Mindouli Cement Plant has a reported capacity of 700,000 t of cement.
Mindouli Cement Plant emits about 280,568 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 65,400 cars. That ranks #1 among tracked facilities in Congo.
Mindouli Cement Plant is in Congo, near coordinates -4.24236, 14.36285.
Mindouli Cement Plant is operated by Diamond Cement Congo SA.