Home / Africa / Egypt / Cement plants / Lafarge Attaka Cement Plant

Lafarge Attaka Cement Plant

Cement Plant in Egypt. Approximate location 29.80615, 32.0869.

Cement PlantEgyptCO₂ reported

Lafarge Attaka Cement Plant is a cement plant in Egypt with a reported capacity of 10,200,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Lafarge Cement Company Egypt SAE. By capacity it ranks #2 of 26 cement plants tracked in Egypt. It emits about 4,073,231 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 949,471 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.

10,200,000t of cement
4,073,231t CO₂e / yr (Climate TRACE)
#2CO₂ rank in Egypt
0.40t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896683.

У контексті: як порівнюється це підприємство

При потужності 10,200,000 t of cement Lafarge Attaka Cement Plant — це значно вище медіана cement plant у Egypt (2,690,000 t of cement). Його викидання CO₂ на одиницю потужності приблизно на 11% вище медіани cement plant. Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.

Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.

What 4,073,231 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

949,471cars driven for a year
531,199homes' annual energy use
67,887,183tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Egypt

National Cement New Beni Suef Cement Plant: 12,000,000 t of cement12.0MNational C…Lafarge Attaka Cement Plant: 10,200,000 t of cement10.2MLafarge At…Helwan Cement Plant: 8,000,000 t of cement8.0MHelwan Cem…National Cement El Hassana Cement Plant: 7,000,000 t of cement7.0MNational C…Assiuit Cement Asyut Plant: 5,700,000 t of cement5.7MAssiuit Ce…Arabian Cement Attaka Plant: 5,000,000 t of cement5.0MArabian Ce…Borg El Arab Cement Plant: 4,800,000 t of cement4.8MBorg El Ar…Tura Cement Plant: 4,000,000 t of cement4.0MTura Cemen…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Lafarge Cement Company Egypt SAE. All facilities by this operator →

Local climate

Lafarge Attaka Cement Plant sits in a hot desert climate zone (Köppen BWh), at 29.8°N in the northern hemisphere.

~24°Ctypical annual mean
~34°Ctypical warm-season
Hot desert: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 26 cement plants in Egypt by reported capacity.

Nearby industrial sites

Location

Coordinates 29.80615, 32.0869. View on OpenStreetMap.

Heat loss & insulation profile

A cement plant like this runs hot equipment that sheds heat continuously: rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves (surface/process temperatures around 200–1,000 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 19,000 MWh/yr (≈ 6,500 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.

See Inzonex insulation → Estimate your site →

Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.

Safety & the no-regret first step

Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.

External climate finance your country can access

Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:

CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.

Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.

Frequently asked questions

What type of facility is Lafarge Attaka Cement Plant?

Lafarge Attaka Cement Plant is a cement plant in Egypt. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Lafarge Attaka Cement Plant?

Lafarge Attaka Cement Plant has a reported capacity of 10,200,000 t of cement.

How much CO₂ does Lafarge Attaka Cement Plant emit?

Lafarge Attaka Cement Plant emits about 4,073,231 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 949,471 cars. That ranks #2 among tracked facilities in Egypt.

Where is Lafarge Attaka Cement Plant located?

Lafarge Attaka Cement Plant is in Egypt, near coordinates 29.80615, 32.0869.

Who operates Lafarge Attaka Cement Plant?

Lafarge Attaka Cement Plant is operated by Lafarge Cement Company Egypt SAE.

Built from open public data; no personal information. Operate this site? Request a correction or removal.