Cement Plant in China. Approximate location 42.87224, 126.15309.
Cement PlantChinaCO₂ reported
Jidong Cement Panshi Co Ltd Cement Plant is a cement plant in China with a reported capacity of 800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Jidong Cement Panshi Co Ltd. By capacity it ranks #696 of 739 cement plants tracked in China. It emits about 318,989 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 74,356 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895518.
При потужності 800,000 t of cement Jidong Cement Panshi Co Ltd Cement Plant — це нижче медіана cement plant у China (2,000,000 t of cement). Його викидання CO₂ на одиницю потужності приблизно на 11% вище медіани cement plant. Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Jidong Cement Panshi Co Ltd. All facilities by this operator →
Jidong Cement Panshi Co Ltd Cement Plant sits in a monsoon hot-summer continental climate zone (Köppen Dwa), at 42.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #696 largest of 739 cement plants in China by reported capacity.
Coordinates 42.87224, 126.15309. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Jidong Cement Panshi Co Ltd Cement Plant is a cement plant in China. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Jidong Cement Panshi Co Ltd Cement Plant has a reported capacity of 800,000 t of cement.
Jidong Cement Panshi Co Ltd Cement Plant emits about 318,989 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 74,356 cars. That ranks #1367 among tracked facilities in China.
Jidong Cement Panshi Co Ltd Cement Plant is in China, near coordinates 42.87224, 126.15309.
Jidong Cement Panshi Co Ltd Cement Plant is operated by Jidong Cement Panshi Co Ltd.