Cement Plant in Turkmenistan. Approximate location 39.68401, 54.30231.
Cement PlantTurkmenistanCO₂ reported
Jebel Cement Plant is a cement plant in Turkmenistan with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Ministry of Industry and Construction Production (Turkmenistan). By capacity it ranks #3 of 4 cement plants tracked in Turkmenistan. It emits about 530,823 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 123,735 cars. Its CO₂ per unit of capacity is about 47% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897836.
При потужності 1,000,000 t of cement Jebel Cement Plant — це нижче медіана cement plant у Turkmenistan (2,000,000 t of cement). Його викидання CO₂ на одиницю потужності приблизно на 12% нижче медіани cement plant. Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Ministry of Industry and Construction Production (Turkmenistan). All facilities by this operator →
Jebel Cement Plant sits in a cold desert climate zone (Köppen BWk), at 39.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 4 cement plants in Turkmenistan by reported capacity.
Coordinates 39.68401, 54.30231. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Jebel Cement Plant is a cement plant in Turkmenistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Jebel Cement Plant has a reported capacity of 1,000,000 t of cement.
Jebel Cement Plant emits about 530,823 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 123,735 cars. That ranks #5 among tracked facilities in Turkmenistan.
Jebel Cement Plant is in Turkmenistan, near coordinates 39.68401, 54.30231.
Jebel Cement Plant is operated by Ministry of Industry and Construction Production (Turkmenistan).