Cement Plant in United Arab Emirates. Approximate location 25.97243, 56.07082.
Cement PlantUnited Arab EmiratesCO₂ reported
Gulf Cement Ras Al Khaimah Plant is a cement plant in United Arab Emirates with a reported capacity of 3,800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Gulf Cement Company PSC. By capacity it ranks #4 of 12 cement plants tracked in United Arab Emirates. It emits about 1,577,006 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 367,600 cars. Its CO₂ per unit of capacity is about 15% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895094.
При потужності 3,800,000 t of cement Gulf Cement Ras Al Khaimah Plant — це значно вище медіана cement plant у United Arab Emirates (2,700,000 t of cement). Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Gulf Cement Company PSC. All facilities by this operator →
Gulf Cement Ras Al Khaimah Plant sits in a hot desert climate zone (Köppen BWh), at 26.0°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #4 largest of 12 cement plants in United Arab Emirates by reported capacity.
Coordinates 25.97243, 56.07082. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Gulf Cement Ras Al Khaimah Plant is a cement plant in United Arab Emirates. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Gulf Cement Ras Al Khaimah Plant has a reported capacity of 3,800,000 t of cement.
Gulf Cement Ras Al Khaimah Plant emits about 1,577,006 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 367,600 cars. That ranks #10 among tracked facilities in United Arab Emirates.
Gulf Cement Ras Al Khaimah Plant is in United Arab Emirates, near coordinates 25.97243, 56.07082.
Gulf Cement Ras Al Khaimah Plant is operated by Gulf Cement Company PSC.