Home / Asia / Pakistan / Cement plants / Gharibwal Cement Ismailwal Cement Plant

Gharibwal Cement Ismailwal Cement Plant

Cement Plant in Pakistan. Approximate location 32.72584, 73.14323.

Cement PlantPakistanCO₂ reported

Gharibwal Cement Ismailwal Cement Plant is a cement plant in Pakistan with a reported capacity of 2,110,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Gharibwal Cement Ltd. By capacity it ranks #18 of 31 cement plants tracked in Pakistan. It emits about 967,438 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 225,510 cars. Its CO₂ per unit of capacity is about 27% above the median cement plant.

2,110,000t of cement
967,438t CO₂e / yr (Climate TRACE)
#22CO₂ rank in Pakistan
0.46t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897621.

У контексті: як порівнюється це підприємство

При потужності 2,110,000 t of cement Gharibwal Cement Ismailwal Cement Plant — це приблизно медіана cement plant у Pakistan (2,300,000 t of cement). Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.

Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.

What 967,438 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

225,510cars driven for a year
126,166homes' annual energy use
16,123,967tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Pakistan

Lucky Cement Pezu Cement Plant: 10,250,000 t of cement10.2MLucky Ceme…Maple Leaf Iskandarabad (White) Cement Plant: 8,190,000 t of cement8.2MMaple Leaf…Pioneer Cement Khushab Cement Plant: 5,190,000 t of cement5.2MPioneer Ce…Lucky Cement Karachi Cement Plant: 5,050,000 t of cement5.0MLucky Ceme…Cherat Cement Lakari Cement Plant: 4,500,000 t of cement4.5MCherat Cem…Attock Cement Hub Cement Plant: 4,300,000 t of cement4.3MAttock Cem…Bestway Cement Hattar Cement Plant: 3,900,000 t of cement3.9MBestway Ce…Fauji Cement Nizampur Cement Plant: 3,750,000 t of cement3.7MFauji Ceme…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Gharibwal Cement Ltd. All facilities by this operator →

Local climate

Gharibwal Cement Ismailwal Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 32.7°N in the northern hemisphere.

~19°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical (dry winter): hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #18 largest of 31 cement plants in Pakistan by reported capacity.

Nearby industrial sites

Location

Coordinates 32.72584, 73.14323. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Gharibwal Cement Ismailwal Cement Plant?

Gharibwal Cement Ismailwal Cement Plant is a cement plant in Pakistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Gharibwal Cement Ismailwal Cement Plant?

Gharibwal Cement Ismailwal Cement Plant has a reported capacity of 2,110,000 t of cement.

How much CO₂ does Gharibwal Cement Ismailwal Cement Plant emit?

Gharibwal Cement Ismailwal Cement Plant emits about 967,438 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 225,510 cars. That ranks #22 among tracked facilities in Pakistan.

Where is Gharibwal Cement Ismailwal Cement Plant located?

Gharibwal Cement Ismailwal Cement Plant is in Pakistan, near coordinates 32.72584, 73.14323.

Who operates Gharibwal Cement Ismailwal Cement Plant?

Gharibwal Cement Ismailwal Cement Plant is operated by Gharibwal Cement Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.