Cement Plant in Serbia. Approximate location 44.01105, 19.88937.
Cement PlantSerbiaCO₂ reported
Galovici Cement Plant is a cement plant in Serbia with a reported capacity of 750,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Cementara Kosjerić AD. By capacity it ranks #3 of 3 cement plants tracked in Serbia. It emits about 179,998 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 41,958 cars. Its CO₂ per unit of capacity is about 33% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439130.
При потужності 750,000 t of cement Galovici Cement Plant — це нижче медіана cement plant у Serbia (1,000,000 t of cement). Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Cementara Kosjerić AD. All facilities by this operator →
Galovici Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 44.0°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 3 cement plants in Serbia by reported capacity.
Coordinates 44.01105, 19.88937. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Galovici Cement Plant is a cement plant in Serbia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Galovici Cement Plant has a reported capacity of 750,000 t of cement.
Galovici Cement Plant emits about 179,998 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 41,958 cars. That ranks #6 among tracked facilities in Serbia.
Galovici Cement Plant is in Serbia, near coordinates 44.01105, 19.88937.
Galovici Cement Plant is operated by Cementara Kosjerić AD.