Steel Plant in Poland. Approximate location 50.35432, 18.61081.
Steel PlantPolandCO₂ reported
Ferrostal Labedy Gliwice steel plant is a steel plant in Poland with a reported capacity of 500,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Ferrostal Labedy SP zoo. By capacity it ranks #6 of 6 steel plants tracked in Poland. It emits about 26,929 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 6,277 cars. Its CO₂ per unit of capacity is about 90% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567007.
При потужності 500,000 t of steel Ferrostal Labedy Gliwice steel plant — це нижче медіана steel plant у Poland (900,000 t of steel). Його викидання CO₂ на одиницю потужності приблизно на 37% нижче медіани steel plant. Підсектор: iron-and-steel. Як steel plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1500°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Сталеливарні заводи спалюють вугілля у доменних печах або використовують електричні дуги для плавлення брухту; в обох випадках розплавлений метал повинен перебувати вище 1500°C і транспортуватися через розширені гарячі трубопроводи та судини.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Ferrostal Labedy SP zoo. All facilities by this operator →
Ferrostal Labedy Gliwice steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 50.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #6 largest of 6 steel plants in Poland by reported capacity.
Coordinates 50.35432, 18.61081. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Ferrostal Labedy Gliwice steel plant is a steel plant in Poland. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Ferrostal Labedy Gliwice steel plant has a reported capacity of 500,000 t of steel.
Ferrostal Labedy Gliwice steel plant emits about 26,929 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 6,277 cars. That ranks #149 among tracked facilities in Poland.
Ferrostal Labedy Gliwice steel plant is in Poland, near coordinates 50.35432, 18.61081.
Ferrostal Labedy Gliwice steel plant is operated by Ferrostal Labedy SP zoo.