Home / Europe / Serbia / Food & beverage plants / Fabrika Secera Crvenka

Fabrika Secera Crvenka

Food & Beverage in Serbia. Approximate location 45.66217, 19.43515.

Food & BeverageSerbiaCO₂ reported

Fabrika Secera Crvenka is a food & beverage plant in Serbia with a reported capacity of 708,750,000 USD. It processes food, beverages or tobacco — typically with boilers, cookers and dryers. By capacity it ranks #4 of 12 food & beverage plants tracked in Serbia. It emits about 30,388 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 7,083 cars.

30,388t CO₂e / yr (Climate TRACE)
#10CO₂ rank in Serbia

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38480847.

У контексті: як порівнюється це підприємство

При потужності 708,750,000 USD Fabrika Secera Crvenka — це приблизно медіана food & beverage plant у Serbia (708,750,000 USD). Підсектор: food-beverage-tobacco. Як food & beverage plant, воно вимагає високотемпературного технологічного тепла (зазвичай 80–200°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Підприємства харчової та напіткової промисловості використовують котли, варильні апарати, пастеризатори та сушарки, що працюють безперервно; втрати тепла через неізольовані трубопроводи та судини безпосередньо зменшують пропускну здатність та ефективність.

Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.

What 30,388 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

7,083cars driven for a year
3,963homes' annual energy use
506,467tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest food & beverage plants in Serbia

Victoriaoil Doo Šid: 708,750,000 USD708.8MVictoriaoi…Proizvodni Centar Vrbas: 708,750,000 USD708.8MProizvodni…Proizvodni Centar Pećinci: 708,750,000 USD708.8MProizvodni…Fabrika Secera Crvenka: 708,750,000 USD708.8MFabrika Se…Fabrika Secera Te-To Senta: 708,750,000 USD708.8MFabrika Se…Sojaprotein: 708,750,000 USD708.8MSojaproteinFabrika Šećera Crvenka: 708,750,000 USD708.8MFabrika Še…Sojaprotein: 708,750,000 USD708.8MSojaprotein

Reported capacity (USD), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Fabrika Secera Crvenka sits in a temperate oceanic climate zone (Köppen Cfb), at 45.7°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #4 largest of 12 food & beverage plants in Serbia by reported capacity.

Nearby industrial sites

Location

Coordinates 45.66217, 19.43515. View on OpenStreetMap.

Heat loss & insulation profile

A food & beverage plant like this runs hot equipment that sheds heat continuously: cookers & kettles, pasteurisers, CIP hot-water sets, dryers, steam lines, tanks, valves (surface/process temperatures around 70–200 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.

very wide by site size; many bare low-temp surfaces (CIP, steam, pasteurisation) - often toward upper end.

Indicative recoverable energy

On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 7,000 MWh/yr (≈ 1,400 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.

See Inzonex insulation → Estimate your site →

Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.

Safety & the no-regret first step

Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.

External climate finance your country can access

Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:

Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.

Frequently asked questions

What type of facility is Fabrika Secera Crvenka?

Fabrika Secera Crvenka is a food & beverage plant in Serbia. It processes food, beverages or tobacco — typically with boilers, cookers and dryers.

What is the capacity of Fabrika Secera Crvenka?

Fabrika Secera Crvenka has a reported capacity of 708,750,000 USD.

How much CO₂ does Fabrika Secera Crvenka emit?

Fabrika Secera Crvenka emits about 30,388 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 7,083 cars. That ranks #10 among tracked facilities in Serbia.

Where is Fabrika Secera Crvenka located?

Fabrika Secera Crvenka is in Serbia, near coordinates 45.66217, 19.43515.

Built from open public data; no personal information. Operate this site? Request a correction or removal.