Home / Russian Federation / Steel plants / Evraz NTMK steel plant

Evraz NTMK steel plant

Steel Plant in Russian Federation. Approximate location 57.92058, 60.02387.

Steel PlantRussian FederationCO₂ reported

Evraz NTMK steel plant is a steel plant in Russian Federation with a reported capacity of 4,400,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Evraz NTMK JSC. By capacity it ranks #6 of 26 steel plants tracked in Russian Federation. It emits about 6,728,323 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 1,568,374 cars. Its CO₂ per unit of capacity is about 183% above the median steel plant.

4,400,000t of steel
6,728,323t CO₂e / yr (Climate TRACE)
#6CO₂ rank in Russian Federation
1.53t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567024.

У контексті: як порівнюється це підприємство

При потужності 4,400,000 t of steel Evraz NTMK steel plant — це значно вище медіана steel plant у Russian Federation (1,500,000 t of steel). Його викидання CO₂ на одиницю потужності приблизно на 991% вище медіани steel plant. Підсектор: iron-and-steel. Як steel plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1500°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Сталеливарні заводи спалюють вугілля у доменних печах або використовують електричні дуги для плавлення брухту; в обох випадках розплавлений метал повинен перебувати вище 1500°C і транспортуватися через розширені гарячі трубопроводи та судини.

Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.

What 6,728,323 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

1,568,374cars driven for a year
877,455homes' annual energy use
112,138,717tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Russian Federation

Magnitogorsk Iron and Steel Works: 14,500,000 t of steel14.5MMagnitogor…NLMK Lipetsk steel plant: 14,400,000 t of steel14.4MNLMK Lipet…Severstal Cherepovets steel plant: 12,001,000 t of steel12.0MSeverstal …Evraz ZSMK steel plant: 9,901,000 t of steel9.9MEvraz ZSMK…Mechel Chelyabinsk Metallurgical Plant: 5,799,000 t of steel5.8MMechel Che…Evraz NTMK steel plant: 4,400,000 t of steel4.4MEvraz NTMK…Metalloinvest OEMK steel plant: 3,500,000 t of steel3.5MMetalloinv…Amurstal steel plant: 2,150,000 t of steel2.1MAmurstal s…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Evraz NTMK JSC. All facilities by this operator →

Local climate

Evraz NTMK steel plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 57.9°N in the northern hemisphere.

~6°Ctypical annual mean
~19°Ctypical warm-season
Warm-summer humid continental: long cold winters and short, cool summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #6 largest of 26 steel plants in Russian Federation by reported capacity.

Nearby industrial sites

Location

Coordinates 57.92058, 60.02387. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Evraz NTMK steel plant?

Evraz NTMK steel plant is a steel plant in Russian Federation. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Evraz NTMK steel plant?

Evraz NTMK steel plant has a reported capacity of 4,400,000 t of steel.

How much CO₂ does Evraz NTMK steel plant emit?

Evraz NTMK steel plant emits about 6,728,323 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 1,568,374 cars. That ranks #6 among tracked facilities in Russian Federation.

Where is Evraz NTMK steel plant located?

Evraz NTMK steel plant is in Russian Federation, near coordinates 57.92058, 60.02387.

Who operates Evraz NTMK steel plant?

Evraz NTMK steel plant is operated by Evraz NTMK JSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.