Cement Plant in Tunisia. Approximate location 34.93791, 8.53022.
Cement PlantTunisiaCO₂ reported
Bizerte Cement Plant is a cement plant in Tunisia with a reported capacity of 1,350,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Les Ciments de Bizerte SA. By capacity it ranks #6 of 7 cement plants tracked in Tunisia. It emits about 409,640 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 95,487 cars. Its CO₂ per unit of capacity is about 16% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439170.
При потужності 1,350,000 t of cement Bizerte Cement Plant — це нижче медіана cement plant у Tunisia (1,800,000 t of cement). Його викидання CO₂ на одиницю потужності приблизно на 7% нижче медіани cement plant. Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Les Ciments de Bizerte SA. All facilities by this operator →
Bizerte Cement Plant sits in a cold desert climate zone (Köppen BWk), at 34.9°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #6 largest of 7 cement plants in Tunisia by reported capacity.
Coordinates 34.93791, 8.53022. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Bizerte Cement Plant is a cement plant in Tunisia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Bizerte Cement Plant has a reported capacity of 1,350,000 t of cement.
Bizerte Cement Plant emits about 409,640 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 95,487 cars. That ranks #6 among tracked facilities in Tunisia.
Bizerte Cement Plant is in Tunisia, near coordinates 34.93791, 8.53022.
Bizerte Cement Plant is operated by Les Ciments de Bizerte SA.