Cement Plant in Saudi Arabia. Approximate location 16.73577, 43.05023.
Cement PlantSaudi ArabiaCO₂ reported
Ahad Al Masarihah Cement Plant is a cement plant in Saudi Arabia with a reported capacity of 4,900,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Southern Province Cement Co. By capacity it ranks #5 of 19 cement plants tracked in Saudi Arabia. It emits about 2,787,252 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 649,709 cars. Its CO₂ per unit of capacity is about 58% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897767.
При потужності 4,900,000 t of cement Ahad Al Masarihah Cement Plant — це приблизно медіана cement plant у Saudi Arabia (4,000,000 t of cement). Його викидання CO₂ на одиницю потужності приблизно на 64% вище медіани cement plant. Підсектор: cement. Як cement plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1400°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Цементні заводи нагрівають вапняк до 1400°C у обертових печах — один із найгарячіших промислових процесів — і повинні точно контролювати температуру по всій довжині печі.
Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Southern Province Cement Co. All facilities by this operator →
Ahad Al Masarihah Cement Plant sits in a hot desert climate zone (Köppen BWh), at 16.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #5 largest of 19 cement plants in Saudi Arabia by reported capacity.
Coordinates 16.73577, 43.05023. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Ahad Al Masarihah Cement Plant is a cement plant in Saudi Arabia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Ahad Al Masarihah Cement Plant has a reported capacity of 4,900,000 t of cement.
Ahad Al Masarihah Cement Plant emits about 2,787,252 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 649,709 cars. That ranks #11 among tracked facilities in Saudi Arabia.
Ahad Al Masarihah Cement Plant is in Saudi Arabia, near coordinates 16.73577, 43.05023.
Ahad Al Masarihah Cement Plant is operated by Southern Province Cement Co.