Steel Plant in Austria. Approximate location 47.38128, 15.06266.
Steel PlantAustriaCO₂ reported
Voestalpine Stahl Donawitz steel plant is a steel plant in Austria with a reported capacity of 850,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Voestalpine Stahl Donawitz GmbH. By capacity it ranks #2 of 2 steel plants tracked in Austria. It emits about 1,335,721 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 311,357 cars. Its CO₂ per unit of capacity is about 191% above the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566430.
850,000 t of steel'de, Voestalpine Stahl Donawitz steel plant Austria'daki steel plant'lerin medyanı altında 6,000,000 t of steel'dir. Kapasite başına CO₂'si steel plant'nin medyanı altında kabaca 7%'dir. Alt sektör: iron-and-steel. steel plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1500°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çelik fabrikaları yüksek ocaklarda kömür yakar veya hurda ergitmek için elektrik ark kullanır; her iki durumda da eritilmiş metal 1.500°C'nin üstünde tutulmalı ve geniş sıcak borular ve kaplar aracılığıyla aktarılmalıdır.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Voestalpine Stahl Donawitz GmbH. All facilities by this operator →
Voestalpine Stahl Donawitz steel plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 47.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 2 steel plants in Austria by reported capacity.
Coordinates 47.38128, 15.06266. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Voestalpine Stahl Donawitz steel plant is a steel plant in Austria. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Voestalpine Stahl Donawitz steel plant has a reported capacity of 850,000 t of steel.
Voestalpine Stahl Donawitz steel plant emits about 1,335,721 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 311,357 cars. That ranks #3 among tracked facilities in Austria.
Voestalpine Stahl Donawitz steel plant is in Austria, near coordinates 47.38128, 15.06266.
Voestalpine Stahl Donawitz steel plant is operated by Voestalpine Stahl Donawitz GmbH.