Cement Plant in United Arab Emirates. Approximate location 25.96746, 56.06538.
Cement PlantUnited Arab EmiratesCO₂ reported
Union Cement Ras Al-Khaimah Plant is a cement plant in United Arab Emirates with a reported capacity of 4,800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Union Cement Company PrJSC. By capacity it ranks #2 of 12 cement plants tracked in United Arab Emirates. It emits about 2,096,356 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 488,661 cars. Its CO₂ per unit of capacity is about 21% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895106.
4,800,000 t of cement'de, Union Cement Ras Al-Khaimah Plant United Arab Emirates'daki cement plant'lerin medyanı çok üstünde 2,700,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı üstünde kabaca 8%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Union Cement Company PrJSC. All facilities by this operator →
Union Cement Ras Al-Khaimah Plant sits in a hot desert climate zone (Köppen BWh), at 26.0°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 12 cement plants in United Arab Emirates by reported capacity.
Coordinates 25.96746, 56.06538. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Union Cement Ras Al-Khaimah Plant is a cement plant in United Arab Emirates. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Union Cement Ras Al-Khaimah Plant has a reported capacity of 4,800,000 t of cement.
Union Cement Ras Al-Khaimah Plant emits about 2,096,356 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 488,661 cars. That ranks #8 among tracked facilities in United Arab Emirates.
Union Cement Ras Al-Khaimah Plant is in United Arab Emirates, near coordinates 25.96746, 56.06538.
Union Cement Ras Al-Khaimah Plant is operated by Union Cement Company PrJSC.