Cement Plant in Colombia. Approximate location 9.47183, -75.46582.
Cement PlantColombiaCO₂ reported
Tolu Cement Plant is a cement plant in Colombia with a reported capacity of 800,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Cementos Argos SA. By capacity it ranks #8 of 14 cement plants tracked in Colombia. It emits about 178,740 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 41,664 cars. Its CO₂ per unit of capacity is about 38% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896569.
800,000 t of cement'de, Tolu Cement Plant Colombia'daki cement plant'lerin medyanı altında 1,095,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı altında kabaca 28%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Cementos Argos SA. All facilities by this operator →
Tolu Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 9.5°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #8 largest of 14 cement plants in Colombia by reported capacity.
Coordinates 9.47183, -75.46582. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Tolu Cement Plant is a cement plant in Colombia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Tolu Cement Plant has a reported capacity of 800,000 t of cement.
Tolu Cement Plant emits about 178,740 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 41,664 cars. That ranks #12 among tracked facilities in Colombia.
Tolu Cement Plant is in Colombia, near coordinates 9.47183, -75.46582.
Tolu Cement Plant is operated by Cementos Argos SA.