Home / Russian Federation / Steel plants / TMK Seversky Pipe Plant

TMK Seversky Pipe Plant

Steel Plant in Russian Federation. Approximate location 56.48154, 60.24486.

Steel PlantRussian FederationCO₂ reported

TMK Seversky Pipe Plant is a steel plant in Russian Federation with a reported capacity of 950,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Severskiy Trubnyi Zavod JSC. By capacity it ranks #19 of 26 steel plants tracked in Russian Federation. It emits about 55,948 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,041 cars. Its CO₂ per unit of capacity is about 89% below the median steel plant.

950,000t of steel
55,948t CO₂e / yr (Climate TRACE)
#179CO₂ rank in Russian Federation
0.06t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567028.

Bağlamda: bu tesis nasıl karşılaştırılır

950,000 t of steel'de, TMK Seversky Pipe Plant Russian Federation'daki steel plant'lerin medyanı altında 1,500,000 t of steel'dir. Kapasite başına CO₂'si steel plant'nin medyanı altında kabaca 58%'dir. Alt sektör: iron-and-steel. steel plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1500°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çelik fabrikaları yüksek ocaklarda kömür yakar veya hurda ergitmek için elektrik ark kullanır; her iki durumda da eritilmiş metal 1.500°C'nin üstünde tutulmalı ve geniş sıcak borular ve kaplar aracılığıyla aktarılmalıdır.

Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.

What 55,948 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

13,041cars driven for a year
7,296homes' annual energy use
932,467tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Russian Federation

Magnitogorsk Iron and Steel Works: 14,500,000 t of steel14.5MMagnitogor…NLMK Lipetsk steel plant: 14,400,000 t of steel14.4MNLMK Lipet…Severstal Cherepovets steel plant: 12,001,000 t of steel12.0MSeverstal …Evraz ZSMK steel plant: 9,901,000 t of steel9.9MEvraz ZSMK…Mechel Chelyabinsk Metallurgical Plant: 5,799,000 t of steel5.8MMechel Che…Evraz NTMK steel plant: 4,400,000 t of steel4.4MEvraz NTMK…Metalloinvest OEMK steel plant: 3,500,000 t of steel3.5MMetalloinv…Amurstal steel plant: 2,150,000 t of steel2.1MAmurstal s…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Severskiy Trubnyi Zavod JSC. All facilities by this operator →

Local climate

TMK Seversky Pipe Plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 56.5°N in the northern hemisphere.

~6°Ctypical annual mean
~19°Ctypical warm-season
Warm-summer humid continental: long cold winters and short, cool summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #19 largest of 26 steel plants in Russian Federation by reported capacity.

Nearby industrial sites

Location

Coordinates 56.48154, 60.24486. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is TMK Seversky Pipe Plant?

TMK Seversky Pipe Plant is a steel plant in Russian Federation. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of TMK Seversky Pipe Plant?

TMK Seversky Pipe Plant has a reported capacity of 950,000 t of steel.

How much CO₂ does TMK Seversky Pipe Plant emit?

TMK Seversky Pipe Plant emits about 55,948 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 13,041 cars. That ranks #179 among tracked facilities in Russian Federation.

Where is TMK Seversky Pipe Plant located?

TMK Seversky Pipe Plant is in Russian Federation, near coordinates 56.48154, 60.24486.

Who operates TMK Seversky Pipe Plant?

TMK Seversky Pipe Plant is operated by Severskiy Trubnyi Zavod JSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.