Cement Plant in China. Approximate location 34.14079, 113.42303.
Cement PlantChinaCO₂ reported
Tianrui Group Yuzhou Cement Company Cement Plant is a cement plant in China with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Tianrui Group Yuzhou Cement Co Ltd. By capacity it ranks #660 of 739 cement plants tracked in China. It emits about 294,923 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 68,747 cars. Its CO₂ per unit of capacity is about 18% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437644.
1,000,000 t of cement'de, Tianrui Group Yuzhou Cement Company Cement Plant China'daki cement plant'lerin medyanı altında 2,000,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı altında kabaca 18%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Tianrui Group Yuzhou Cement Co Ltd. All facilities by this operator →
Tianrui Group Yuzhou Cement Company Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 34.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #660 largest of 739 cement plants in China by reported capacity.
Coordinates 34.14079, 113.42303. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Tianrui Group Yuzhou Cement Company Cement Plant is a cement plant in China. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Tianrui Group Yuzhou Cement Company Cement Plant has a reported capacity of 1,000,000 t of cement.
Tianrui Group Yuzhou Cement Company Cement Plant emits about 294,923 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 68,747 cars. That ranks #1386 among tracked facilities in China.
Tianrui Group Yuzhou Cement Company Cement Plant is in China, near coordinates 34.14079, 113.42303.
Tianrui Group Yuzhou Cement Company Cement Plant is operated by Tianrui Group Yuzhou Cement Co Ltd.