Cement Plant in Russian Federation. Approximate location 49.00502, 131.89791.
Cement PlantRussian FederationCO₂ reported
Teploozersky Cement Plant is a cement plant in Russian Federation with a reported capacity of 630,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Spasskcement JSC. By capacity it ranks #45 of 53 cement plants tracked in Russian Federation. It emits about 194,277 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 45,286 cars. Its CO₂ per unit of capacity is about 14% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42546916.
630,000 t of cement'de, Teploozersky Cement Plant Russian Federation'daki cement plant'lerin medyanı altında 1,700,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı altında kabaca 26%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.
Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Spasskcement JSC. All facilities by this operator →
Teploozersky Cement Plant sits in a monsoon warm-summer continental climate zone (Köppen Dwb), at 49.0°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #45 largest of 53 cement plants in Russian Federation by reported capacity.
Coordinates 49.00502, 131.89791. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Teploozersky Cement Plant is a cement plant in Russian Federation. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Teploozersky Cement Plant has a reported capacity of 630,000 t of cement.
Teploozersky Cement Plant emits about 194,277 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 45,286 cars. That ranks #147 among tracked facilities in Russian Federation.
Teploozersky Cement Plant is in Russian Federation, near coordinates 49.00502, 131.89791.
Teploozersky Cement Plant is operated by Spasskcement JSC.