Home / Africa / Tanzania / Cement plants / Songwe Cement Plant

Songwe Cement Plant

Cement Plant in Tanzania. Approximate location -8.9426, 33.24101.

Cement PlantTanzaniaCO₂ reported

Songwe Cement Plant is a cement plant in Tanzania with a reported capacity of 1,100,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Mbeya Cement Company Ltd. By capacity it ranks #3 of 6 cement plants tracked in Tanzania. It emits about 346,822 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 80,844 cars. Its CO₂ per unit of capacity is about 12% below the median cement plant.

1,100,000t of cement
346,822t CO₂e / yr (Climate TRACE)
#4CO₂ rank in Tanzania
0.32t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897927.

Bağlamda: bu tesis nasıl karşılaştırılır

1,100,000 t of cement'de, Songwe Cement Plant Tanzania'daki cement plant'lerin medyanı yaklaşık 1,100,000 t of cement'dir. Kapasite başına CO₂'si cement plant'nin medyanı altında kabaca 33%'dir. Alt sektör: cement. cement plant olarak, temel endüstriyel işlemleri için yoğun proses ısısı (tipik olarak 800–1400°C) gerektirir — kazanlar, fırınlar veya doğrudan yanma ile sağlanması gereken ısı, ve izolasyon yapılmamış kaplar ve boruların kayıpları harcanan yakıtı temsil eder. Modüler çıkarılabilir yalıtım bu kayıpları %80–96 oranında azaltabilir, yüzeyleri ≤45°C'ye soğutabilir, geri ödeme süresi genellikle 2 yıldan azdır. Çimento fabrikaları kireci döner ocaklarda 1.400°C'ye ısıtır — en sıcak endüstriyel işlemlerden biridir — ve sıcaklığı fırının tüm uzunluğunda hassasiyetle kontrol etmelidir.

Kapasite ve CO₂ yoğunluğu karşılaştırması Climate TRACE endüstriyel tesis verilerinden hesaplanmıştır; sektör rolü mühendislik referansına dayanmaktadır.

What 346,822 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

80,844cars driven for a year
45,230homes' annual energy use
5,780,367tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Tanzania

Mtwara Cement Plant: 3,000,000 t of cement3.0MMtwara Cem…Tanzania Portland Tanga Cement Plant: 1,300,000 t of cement1.3MTanzania P…Songwe Cement Plant: 1,100,000 t of cement1.1MSongwe Cem…Huaxin Tanga Cement Plant: 800,000 t of cement800kHuaxin Tan…Tanzania Portland Dar Es Salaam Cement Plant: 700,000 t of cement700kTanzania P…Lake Cement Plant: 600,000 t of cement600kLake Cemen…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Mbeya Cement Company Ltd. All facilities by this operator →

Local climate

Songwe Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 8.9°S in the southern hemisphere.

~19°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical (dry winter): hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #3 largest of 6 cement plants in Tanzania by reported capacity.

Location

Coordinates -8.9426, 33.24101. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Songwe Cement Plant?

Songwe Cement Plant is a cement plant in Tanzania. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Songwe Cement Plant?

Songwe Cement Plant has a reported capacity of 1,100,000 t of cement.

How much CO₂ does Songwe Cement Plant emit?

Songwe Cement Plant emits about 346,822 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 80,844 cars. That ranks #4 among tracked facilities in Tanzania.

Where is Songwe Cement Plant located?

Songwe Cement Plant is in Tanzania, near coordinates -8.9426, 33.24101.

Who operates Songwe Cement Plant?

Songwe Cement Plant is operated by Mbeya Cement Company Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.